A. Construction Supervision, Monitoring and Contract Management of Road Projects

Project Completion Certificate
    Site Investigation and necessary redesign of Lambu Bridge, Terathum and Dyadigad Bridge, Doti
Location Terthum and Doti
Client/Finance LRBP
Period January, 2013 to September, 2013
Value of service 0.58
Remark SITARA and GEC JV
Project Completion Certificate
    Consulting Services for Feasibility Study, Detailed Engineering Survey, Soil Investigation and Detailed Design of Mahakali Bridge, Contract No: BB-DSB-Mahakali-071/72
Location Kanchanpur, Dodhara
Client/Finance Bridge Branch, DOR
Period July 2016 to July 2017
Value of service 8.2
Remark CIAS P. Ltd SITARA and CIS P. Ltd JV
Project Completion Certificate
    Design Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological study and Detailed Design of the bridges under Contract Package no. ACQMP/337145/071/072/005 (8 Numbers)
Location Along Kaligandaki Corridor
Client/Finance Bridge Branch, DOR
Period August 2015 to August 2016
Value of service 6.4
Remark TSE-SITARAMaterial Test JV
Project Completion Certificate
    Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Moterable Bridges in Morang and Jhapa District. (Package No-3) (11 Number Bridges)
Location Morang & Jhapa
Client/Finance BP/DOR
Period July 2009-February 2010
Value of service 4.9
Remark TIME JV SITARA
Project Completion Certificate
    Initial environmental examination (IEE) study for Lamosangu-Jiri Road (110 Km)
Location Sindhupalchowk and Dolakha Districts
Client/Finance GESU/DOR
Period June 2014- June 2016
Value of service 0.75
Remark Multi-SITARA JV
Project Completion Certificate
    Environmental Impact Assessment (EIA) Study of Seti Lok Marga (125 Km)
Location Kailali,Doti and Achham Districts
Client/Finance GESU/DOR
Period January 2012 to November 2016
Value of service 2.5
Remark SMulti-SITARA JV
Project Completion Certificate
    Initial environmental examination study for Chhepetar-Luitel-Thatipokhari- Lamjung road
Location Gorkha
Client/Finance GESU/DOR
Period July 2013 to June 2014
Value of service 0.264
Remark SITARA
Project Completion Certificate
    Detailed Engineering Survey, Design and report preparation of roads in Doti, Kalikot, Surkhet and palpa districts.
     
    • i) Khulalu Lalu Kasa Laifu Kalikot Road (22.78 Km),Kalikot
    • ii) Jamphu Phant Pipalneta Panchtale Gufa Hanse Gaun Thada Gada Dhankot Jungleghat Sadak (19.55 Km), Surkhet
    • iii) Silgadi Okharbot- Osile Baglev Jinnana Khaptad Sadak ( 30.08 ),Doti
    • iv) Lalighat Santurali Bhimansthal Triveni Badimalika Sadak ( 34.8 Km ),Kalikot
    • v) Saljhandi Surunge Dhunga Sadak (12.18 Km),Palpa
Location Kailali and Bardiya District
Client/Finance PMEU/DOR
Period January 2017 to April 2017
Value of service 5.312
Remark SITARA-Homeland JV
Project Completion Certificate
    Detailed Engineering Survey Design and Report Preparation of Roads of
     
    • i) Mariayaghat-Thapapur-Jhabani-Baniya-Sadakpur Sadak, Kailali (28.14 Km)
    • ii) Gulariyaghat Bhajani Mude, Kailali (8.8 Km)
    •  
    • iii) Chandan Chauki-Phulbari-Chaumala MRM Sadak, Kailali (31.6 Km)
    • iv) Tikapur Dudjhari MRM Section, Kailali (14.00 Km)
    • v) Kothiya Thakurdwara- Amreni Sadak, Bardiya (20.64 Km)
    • vi) Bichhya Naka-Aama Bardiya Dhanaura-Orali Bajar-Aampur-Dalla-Thakurdwara-Ambasa Sadak, Bardiya (25.00 Km), Contract ID: PMEU/337366/073/74 DPR2
Location Kailali and Bardiya District
Client/Finance PMEU/DOR
Period January 2017 to April 2017
Value of service 5.312
Remark SITARA-Homeland JV
Project Completion Certificate
    Detailed Engineering Survey, Design and Report Preparation of Roads of
     
    • i) Mahendranagar (Dhanusa)-Gaushala-Haripurwa-Malangwa (Sariahi) Adhuro Sadak, Mahottari (39.95 Km)
    • ii) Kusum Khola Mainadi Mujhung Amalabaas Sadak, Palpa (47.91 Km)
    •  
    • iii) Chandan Nath 8-ko Mul Sadak Talimahat Caunko Pul-Chiyalghat Sadak, Jumla (0.44 Km), Contract ID: PMEU/337159/072/73 DPR 27
Location Dhanusa, Sarlahi, Mohattari, Palpa and Jumla District
Client/Finance PMEU/DOR
Period September 2016 to July 2017
Value of service 5.47
Remark TSE-SITARA JV
Project Completion Certificate
    Detailed Engineering Survey and Design of Highway and other Structures (for Upgrading of this Section to Blacktop Standard) and Preparation of Detailed Project Report (DPR) of Burtibang – Patihalne Section of Mid Hill Highway in Baglung District
Location Baglung Distric
Client/Finance Mid Hill West,(Puspalal) Highway Project/DOR
Period February 2015 to December 2015
Value of service 1.84
Remark TSE-SITARA JV
Project Completion Certificate
    Detailed Engineering Survey, Detailed Design, Cost Estimate and DPR Preparation of Myanglung-Okhre-Sukrabare-Chaparichowk-Dagappa (30.6 km) Within Terhathum District (Contract ID: P-01-SNRTP (W2)- THE-MYA/2071-072
Location Terhathum
Client/Finance SNRTP/DDC Terhathum
Period August 2015 to November 2015
Value of service 1.480
Remark CIAS-SITARAEOCODE
Project Completion Certificate
    Detailed Engineering Survey, Detailed Design, Cost Estimate and DPR Preparation of Isibu-Samdu-Khamlalung-Sangkranti (30 km) Within Terhathum District (Contract ID: P-02-SNRTP (W2)-THE-MYA/2071-072
Location Terhathum
Client/Finance SNRTP/DDC Terhathum
Period August 2015 to August 2015
Value of service 1.471
Remark CIAS-SITARAEOCODE
Project Completion Certificate
    Detailed Engineering Survey, Design and report preparation of Gachhe Dhikura Dhanachaur,Lamtal Road (48.76 Km) in Arghakhanchi District
Location Argakhanchi District
Client/Finance DCC Arghakhanchi
Period December 2016 to February 2017
Value of service 2.5
Remark SITARA
Project Completion Certificate
    Detailed Engineering Survey and Design of Highway and other Structures (for Upgrading of this Section to Blacktop Standard) and Preparation of Detailed Project Report (DPR) of Patihalne - Rukumkot Section of Mid Hill Highway in Rukum Distric
Location Rukum District
Client/Finance Mid Hill West,(Puspalal) Highway Project/DOR
Period February 2015 to December 2015
Value of service 1.84
Remark TSE-SITARA JV
Project Completion Certificate
    Detailed Engineering Survey, Design and Report Preparation of Following Roads:
     
    • i) Aathrai Mansaari Thoklung Fedaam Ekikrit Road (Terhathum)
    • ii) Kawasoti Bojhapokhari Dedhgaun Vimaad Khaireni Road (Tanahun Section)
Location Terhathum and Tanahun
Client/Finance PMEU/DOR
Period May 2015 to December 2015
Value of service 2.033
Remark TSE-SILT-SITARA JVV
Project Completion Certificate
    Preparation of Detailed Project Report ,DPR
     
    • i) Survey and Investigation
    • ii) Detailed Design, Drawing and Cost Estimate of Upgrading Works of 1. Beteni- Majhkharka Road 14A003R (Ch. 6+000 to 16+000), 2. Ranibas – Rauta- Salle-Kurletar Road 14A005R (Ch. 0+000to 12+000), 3. Katari – Bahunitar – Barre Road 14A006R (ch. 0+000 to 10+000) and 4. Nepaltar – Udayapur – Kurkuntar Road 14A013R (ch. 0+000 to 8+500) in Udayapur District Under SNRTP Programe (Tatal Road Length 40.50 km)
    •  
    • iii) Mangalbare -Ivang Road (19.9 Km)
Location Udayapur
Client/Finance DDC Udayapur
Period May 2015 to November 2015
Value of service 1.62
Remark SITARA - EcoCoDe - SLATE-JV
Project Completion Certificate
    Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km
Location Baglung
Client/Finance Mid Hill West,(Puspalal) Highway Project/DOR
Period November 2013 to May 2014
Value of service 3.98
Remark TSE-SITARA JV
Project Completion Certificate
    Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km
Location Panchthar
Client/Finance Mid Hill Highway Project, Eastern Sector/DOR
Period May 2013 to Feb 2014
Value of service 4.48
Remark TSE-SITARA JV
Project Completion Certificate
    Detailed Design Engineering Survey, Design and Preparation of Detailed Project Report(DPR) of Beltarbazar-Kamphughat-Pamakham Bhanjyang- Temke-Sapsudhap-Mayur Dand-Salpa Pokhari-Gudel to Solu Salleri Road
Location Khotang, Bhojpur and Solukhumbhu Districts
Client/Finance Asset Management, Contract Management and
Period April 2014 to September 2014
Value of service NRs 71,41,500.0 0
Remark TSE- Tech- SITARA(JV)
Project Completion Certificate
    Consulting Services for Detailed Engineering survey DCP Test Design of roads, concise IEE Study and DPR Preparation of Lamu Sanghu Jiri Road Sindhupkhowk , Dolakha (117Km ) ( package no PMUE - 337\ 069\070- Dpr -1)
Location Sindhupalchowk, Dolakha
Client/Finance PMEU/DOR
Period July 2013 to July 2014
Value of service 6.938
Remark TAEC-TSE Tech - SITARA JV
Project Completion Certificate
    Detailed Survey, Engineering Design, Cost Estimattion and Report Preparation of Num-Kimathanka Sector (45.5 Km) Khadbari, Sankhuwa
Location Sankhuwasava
Client/Finance DOR
Period July 2010 – April 2011
Value of service 1.205
Remark SITARA
Project Completion Certificate
    Local Road Asset Management Consultant in Shankhuwasava District
Location Sankhuwasabha District
Client/Finance Rural access Program, Phase 3
Period 06 February 2014 to 30 April 2015
Value of service 12.23
Remark GEC-SITARA JV
Project Completion Certificate
    Construction Supervision of Upgrading Works of following roads (Package D) in
     
    • Rajbiraj and Saptari DistrictRajbiraj – Sankhada RoadRajbiraj - Rupani RoadRajbiraj – Bhardah Road (41.97 Km)
Location Saptari
Client/Finance DOR / RIP
Period Oct 2012 to Nov 2014
Value of service 15.93
Remark GECMULTI_ SITARA Nepal Consult JV
Project Completion Certificate
    Detailed Engineering Design, IEE, DPR and Construction Supervision of
     
    • i) I.Na.Pa.-Dhudhang-Soyang-nayabazar Road(7.12 Km)
    • ii) Rajduwali-Chisapani-Dhanabari Road (23.3 Km) iii) Mangalbare -Ivang Road (19.9 Km)
    •  
    • iii) Mangalbare -Ivang Road (19.9 Km)
Location Ilam
Client/Finance ADB/RRRSDP /DDC Ilam
Period February, 2009 to June, 2013
Value of service 13.917
Remark JV EAST
Project Completion Certificate
    Detailed Engineering Design ,IEE ,DPR Preparation and Construction Supervision of
     
    • i) tikharka - Jitpur Road (20.16 Km)
    • ii) Trishule - Hattikharka - Jitpur Road (20.16 Km)
    •  
    • iii) Raja Rani - 6 No. Budhabare Road (26.08 Km)
    • iv) No. Budhabare - Phirkaule (3.40 Km)
Location Dhankuta
Client/Finance ADB/RRRSDP/DDC Dhankuta
Period March, 2009 to June
Value of service 13.917
Remark JV EAST

B. Detailed Engineering Survey, Design and Detailed Project Report Preparation of Road Projects

Project Completion Certificate
    Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)
Location Kapilbastu
Client/Finance Jawalakhel,Lalitpur
Period
Value of service 2.768
Remark ERMC-SILT-SITARA JV
Project Completion Certificate
    Detailed Planning and Engineering Design of Branch Canals and Associated Command Area Development Downstream of Ch. 35+000 Km of Sikta IP (14,400 ha)
Location Banke
Client/Finance DOI/SIP
Period December 2015 to May 2017
Value of service 19.77
Remark CMS-FBC-SITARA JV
Project Completion Certificate
    Detailed Engineering Survey, Design and Cost Estimate for the Rehabilitation of Banganga Irrigation System (6350 ha) (Package Number: BIMD/072-73/CS-
Location Kapilbastu
Client/Finance Jawalakhel,Lalitpur
Period June 2016 to May 2017
Value of service 2.768
Remark ERMC-SILT-SITARA JV
Project Completion Certificate
    The study of the utilization of the water resources along the downstream of Budhi Gandaki Hydro electric project
Location Gorkha and Dhading
Client/Finance BGHP
Period 2016
Value of service 3.35
Remark FBC JV SITARA
Project Completion Certificate
    Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Ramechhap District
Location Ramechhap District
Client/Finance LILI / HELVETUS
Period July 2013 to July 2014
Value of service 1.014
Remark SITARA
Project Completion Certificate
    Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Khotang District (FMIS) in Dailakh District
Location Khotang District
Client/Finance LILI / HELVETUS
Period July 2013 to July 2015
Value of service 2.174
Remark SITARA
Project Completion Certificate
    Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Dailakh District
Location Dailakh District
Client/Finance LILI / HELVETUS
Period July 2013 to July 2016
Value of service 1.014
Remark SITARA
Project Completion Certificate
    Detailed Feasibility study of Jhimrukh Dabur Irrigation Project Bangesal VDC Puythan
Location SPuythan
Client/Finance DOI
Period June 2014 to October 2014
Value of service 0.48
Remark SITARA
Project Completion Certificate
    Planning and Design of Typical Lift Irrigation System using Solar Power in Bheri Corridor Area
Location Surkhet District
Client/Finance Bheri Babai Irrigation Project /DOI
Period March 2014 to August 2014
Value of service 0.299
Remark SITARA
Project Completion Certificate
    Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2012/13.
Location Achham and Okhaldhunga
Client/Finance LILI/HELVETAS
Period February, 2013 to September, 2013
Value of service 3.84
Remark SITARA
Project Completion Certificate
    Detailed Feasibility Study of the Extension of the Eastern main Canal of Bagmati Irrigation Project.
Location Sarlahi, Mahottari, Bara, Rautahat and Dahnusha
Client/Finance DOI
Period July, 2012 to June, 2013
Value of service 1.47
Remark FBC JV SITARA
Project Completion Certificate
    Pre-feasibility Study of Madi-Dang Diversion Project
Location Surkhet
Client/Finance DOI Surkhet
Period 2010-2011
Value of service 4.06
Remark CEMECA JV SITARA
Project Completion Certificate
    Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of
     
    • Farmer Managed Irrigation Schemes (FMIS) in
    • different Distirct in F/Y 2010/11.
Location Khotang,Dailekh,Jajarkot & Achham Distict
Client/Finance LILI/HELVETAS
Period December 2010-2011
Value of service 3.80
Remark SITARA
Project Completion Certificate
    Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2011/12.
Location Dailekh, Okhaldhunga, Jajarkot District.
Client/Finance LILI/HELVETAS
Period Feb 2012-Feb 2013
Value of service 3.03
Remark SITARA
Project Completion Certificate
    Preparation of Asset Management Plan and Financial Management Plan of IWRMP Component B.
Location Kailali
Client/Finance DOI/IWRMP
Period June-October 2010
Value of service 1.2
Remark SITARA
Project Completion Certificate
    1. Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in
     
    • Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)
Location Kalikot and Achham district
Client/Finance LILI/HELVETAS
Period April 2010 July 2010
Value of service 1.55
Remark SITARA

PLANING

Project Completion Certificate
    Preparation of green park master plan and detailed engineering desing and estimation of major infrastructures includes View Tower,Culvert and Swimming Pool.
Location Jeetpur -Simara
Client/Finance JSMC
Period June 2017- July 2017
Value of service 1.93
Remark SITARA
Project Completion Certificate
    Detailed Site Assessment, Preparation of Master Plans and Technical Documents for Reconstruction of different Schools (10 Numbers) in Sindupalchok District.
Location Sindupalchok District
Client/Finance CARITAS Switzerland
Period September 2015 to June 2017
Value of service 2.357
Remark SITARA
Project Completion Certificate
    Detailed Site Assessment, Topographic Survey, Detailed Architectural Design, Detailed Structural Design, Preparation of BOQ, Cost Estimate and Technical Documents for Reconstruction of Three Schools in Kavrepalanchowk, Dolakha and Sindhuli Districts
Location Kavrepalanchowk, Dolakha and Sindhuli Districts
Client/Finance Terres des homes Germany
Period August, 2016 to May 2017
Value of service 0.760
Remark SITARA
Project Completion Certificate
    The study for the preparation of Catchment Area Development and Protection Plan for the Project Including Watershed Management Plan for Budi Ganga Hydropower Project
Location Achham
Client/Finance BGHP
Period April 2016 to July 2016
Value of service 0.949
Remark SITARA
Project Completion Certificate
    Feasibility Study of Resettlement Development nearby proposed Ring Road area of Budhi Gandaki Hydroelectric Project in Gorkha and Dhading Districts (Job No.-2071/72-3)
Location Gorkha and Dhading
Client/Finance BGHP
Period June 2015 to July 2016
Value of service 3.798
Remark Full Bright-SITARA JV
Project Completion Certificate
    Preparation of District Transport Master Plan (DTMP) for Kathmandu, Bhaktapur and Lalitpur District (Contract No:RTI SECTOR_DTMP 001-0012)
Location Kathmandu, Bhaktapur and Lalitpur District
Client/Finance RAP-3
Period January 2013 to September 2013
Value of service 1.805
Remark SITARA
Project Completion Certificate
    Updating of District Transport Master Plan (DTMP) & District Transport Master Plan (DTPP) of Kaski District
Location Kaski
Client/Finance DDC Kaski
Period Augu 2010-April 2011
Value of service 0.799
Remark SITARA Tecnocrate Consult JV
Project Completion Certificate
    Preparation of Master Plan for Tinau River Integrated Development Works
Location Ilam
Client/Finance ADB/RRRSDP /DDC Ilam
Period February, 2009 to June, 2013
Value of service 13.437
Remark JV EAST

BUILDINGS

Project Completion Certificate
    Detailed Design, Drawing (Architectural and Structural) and Cost estimate with site survey of office cum Central Coffee Processing Unit Complex Building (Three Number) in Kavrepalanchow, Nuwakot and Lalitpur Districts.
Location Kavrepalanchow, Nuwakot and Lalitpur Districts.
Client/Finance HELVETAS
Period June 2016 to September 2016
Value of service 0.288
Remark SITARA
Project Completion Certificate
    Detailed Design, Drawing (Architectural and Structural) and Cost estimate with site survey of Agricultural Service Center Office Complex in Melamchi Municipality in Sindupalchowk District
Location Sindupalchowk District
Client/Finance HELVETAS
Period November 2016 to December 2016
Value of service 0.960
Remark SITARA
Project Completion Certificate
    Preparation of green park master plan and detailed engineering design and estimation of major infrastructures includes View Tower, Culvert and Swimming Pool.
Location Jeetpur -Simara
Client/Finance JSMC
Period June 2017- July 2017
Value of service 1.93
Remark SITARA
Project Completion Certificate
    Preparation of Technical Documents ,BOQ and Cost Estimate of 12 Schools
Location Sindhupalchowk
Client/Finance CARITAS
Period April 2007 to February 2018
Value of service 0.6
Remark SITARA
Project Completion Certificate
    Detailed site assessment of different schools for reconstruction of schools in Sindhupalchowk districts.
Location Sindhupalchowk
Client/Finance CARITAS
Period April 2007 to February 2018
Value of service 0.92
Remark SITARA
Project Completion Certificate
    Detailed Site Assessment, Topographic Survey, Detailed Architectural Design, Detailed Structural Design, Preparation of BOQ, Cost Estimate and Technical Documents for Reconstruction of Three Schools in Kavrepalanchowk, Dolakha and Sindhuli Districts
Location Kavrepalanchowk, Dolakha and Sindhuli Districts
Client/Finance Terres des homes Germany
Period August, 2016 to May 2017
Value of service 0.760
Remark SITARA
Project Completion Certificate
    Detailed Site Assessment, Preparation of Master Plans and Technical Documents for Reconstruction of different Schools (10 Numbers) in Sindupalchok District.
Location Sindupalchok District
Client/Finance CARITAS Switzerland
Period September 2015 to June 2017
Value of service 2.357
Remark SITARA
Project Completion Certificate
    Construction Supervision of Gaur Bus Terminal Project (Project No-K3L-001-CS/K#SL-002-CS/K#G-001-C) Gaur,Rautahat District
Location Rautahat
Client/Finance TDF
Period November 2011 to December 2015
Value of service 2.830
Remark TAEC-SITARA JV
Project Completion Certificate
    Preparation of Master Plan and Detailed Engineering Design of a Multipurpose Building Complex in Vyas Municipality (Project No. : - K3G-014-F)
Location Tanahun
Client/Finance TDF
Period April 2014 to August 2015
Value of service 0.736
Remark SITARA
Project Completion Certificate
    Detailed Architectural Design and Structural Design,Drawing,Cost estimate and Bid document preparation of Sworgadawari Dharmasala Building in Puythan District
Location Pyuthan
Client/Finance DDC Pyuthan
Period March 2013 to July 2013
Value of service 0.76
Remark SITARA
Project Completion Certificate
    Construction Supervision of Shree Kajiman Hari-Tika Higher Secondary School Building in Putalibazar Municipality, Syangja (Project Doce No- K2G-059-CS)
Location Syangja
Client/Finance TDF
Period February 2012 to November 2012
Value of service 0.81
Remark TAEC-SITARA JV
Project Completion Certificate
    Detailed Design, Drawing, Cost Estimate of Dharmasal Building at Muktinath
Location Mustang District.
Client/Finance DDC Mustang
Period March 2007-June 2007
Value of service 0.29
Remark PARD JV SITARA

Project Completion Certificate
    Third party monitoring verification of installed renewable energy system
Location Different District
Client/Finance NRREP/AEPC
Period February 2015-August 2015
Value of service 1.7
Remark PIONEER JV
Project Completion Certificate
    Study on Technical Standards for Grid Connection of Micro Hydro in Nepal.
Location Nepal
Client/Finance AEPC
Period Feb 2012- July 2012
Value of service 0.285
Remark SITARA
Project Completion Certificate
    Compilation of Mapping of Micro Hydropower and District Electrification Master Plan (MMHP & DEMP) Report and Upgrading in GIS of 53 Districts of Nepal.
Location 53 Districts of Nepal
Client/Finance AEPC
Period May 2012- July 2012
Value of service 0.508
Remark SITARA
Project Completion Certificate
    Preparation of Strategic Plan for the Development of Micro Hydro through DoLIDAR
Location Kathmandu
Client/Finance DoLIDAR
Period 2012 May – June 2012
Value of service 0.28
Remark SITARA
Project Completion Certificate
    Conduct the Capacity Building of Stakeholders on Mini/Micro Hydropower Development in the Special District (Bajura & Achham)
Location Bajura & Achham
Client/Finance AEPC
Period 2011 May – June 2011
Value of service 0.89
Remark SITARA JV Peace
Project Completion Certificate
    Mapping of Micro Hydropower (MMHP) and Preparation of District Electrification Master Plan (DEMP) in Kavre, Sindhupalchowk, Dolakha, lalitpur, Khotang,Dhankuta & Terathum Districts
Location Kavre, Sindhupalchowk, Dolakha, lalitpur, Khotang,Dhankuta & Terathum Districts
Client/Finance AEPC/MOEn
Period April 2011-July 2011
Value of service 1.75
Remark SITARA
Project Completion Certificate
    Mapping of Micro Hydropower (MMHP) and Preparation of District Electrification Master Plan (DEMP) in Achham,Bajura, Doti,Dadeldhura, Gulmi,Arghakhachi, Syangja & Palpa Districts.
Location Achham,Bajura, Doti,Dadeldhura, Gulmi,Arghakhachi, Syangja & Palpa Districts
Client/Finance AEPC/MOEn
Period April 2011-July 2011
Value of service 1.8
Remark SITARA
Project Completion Certificate
    Detail survey , design and Preparation of Detailed Project Report (DPR) of Simrutu Khola Mini Hydro Project (200 kW) ,Rukum.
Location Rukum District
Client/Finance MOST/AEPC/ESAP
Period November 2009- June 2010
Value of service 0.65
Remark SITARA JV E2
Project Completion Certificate
    Preparation of Implementation Guideline and Technical Mannual for Implementation of Micro Hydro Schemes.
Location Lalitpur
Client/Finance DoLIDAR/MoLD
Period May 2010- August 2010
Value of service 0.5
Remark SITARA
Project Completion Certificate
    Detail survey , design and Preparation of Detailed Project Report (DPR) of Upper Deumai Khola Small Hydro Project (12.8 MW)
Location Illam District
Client/Finance Progress Power Company
Period June 2008- May 2010
Value of service 1.55
Remark SITARA
Project Completion Certificate
    Detail survey ,design , Cost estimate and Preparation of Tender document of Transmission and distribution of Haluwa Khola Mini Hydro Project (400KW), Five VDCS of Ramechhap
Location Ramechhap District.
Client/Finance UNDP/REDP/KIND Project
Period January - July 2008
Value of service 0.35
Remark SITARA

WATER SUPPLY AND SWEWRAGE

Project Completion Certificate
    Detailed Engineering Survey, Design and Report Preparation of Five Different Water Supply Projects in Achham District
Location Achham
Client/Finance DWSS Achham
Period March 2017 to June 2017
Value of service 0.86
Remark SITARA
Project Completion Certificate
    Detailed Engineering Survey, Design and Report Preparation of Six Different Water Supply Projects in Puythan District.
Location Puythan
Client/Finance DWSS Puythan
Period March 2017 to June 2017
Value of service 0.79
Remark SITARA
Project Completion Certificate
    Detailed Engineering Survey, Design and Report Preparation of Seven Different Water Supply Projects in Gulmi District
Location Gulmi
Client/Finance DWSS Gulmi
Period March 2015 to June 2015
Value of service 0.831
Remark SITARA
Project Completion Certificate
    Feasibility study Detailed Survey Design cost Estimate and report preparation of Kamalpokhari overhead Tank Imodal VDC 8 Lalitpur
Location Lalitpur
Client/Finance DDC Lalitpur
Period August 2014 to October 2014
Value of service 0.264
Remark SITARA
Project Completion Certificate
    Detail Survey , Design and Preparation of report of Drinking Water Supply Schemer for the Office of DDC Mugu (10 Schemes)
Location Mugu District
Client/Finance DDC Mugu
Period January 2007- March 2008
Value of service 1.7
Remark 1.7