Provincial Technical Assistance Provider (PTAP) for the Koshi Province under the Trail Bridge sector wide Approach Framework-llI (TB-SWAP llI) Koshi Province
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
(Taplejung, Panchthar, llam, Sankhuwabha, Terathum, Dhankuta, Bhojpur, Solukhumbu, Okhaldhunga, Khotang, Udayapur, Jhapa, Sunsari and Morang) in the Koshi Province (137 Local Governments) | Provincial Government, Ministry of Physical Infrastructure Development, Transport Infrastructure Directorate | July 2021 - January 2024 | NRs 42.57 Million | Northstar-SITARA-Miteri Jv |
Providing Regional Technical Assistance for Trail Bridge Sub-Sector Program (Trail Bridge-Sector Wide Approach FrameWork II), Western Region (Gandaki Province)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Gorkha, Tanahun, Lamjung, Syangja, Kaski, Myagdi, Prabat, Baglung, Gulmi, Palpa, Argakhachi, Manang, Mustang, Nawalprasi | TBSU | November 2014 - November 2019 | NRs 86.67 Million | REMREC-SITARA JV |
Providing Regional Technical Assistance for Trail Bridge Sub-Sector Program (Trail Bridge-Sector Wide Approach FrameWork II), Central Region, Bagmati Province
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dolakha, Ramechhap, Sindhuli, Kavrepalanchowk, Sindhupalchowk, Kathmandu, Bhaktapur, Lalitpur, Nuwakot, Rasuwa, Dhading, Makawanpur, Chitwan | TBSU | November 2014 - November 2019 | NRs 85.66 Million | REMREC-SITARA JV |
Detailed Engineering survey, design and cost estimate of trail bridges under Package no: EP-3/073/74
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Taplejung, Panchthar, Jhapa, Illam | SBD | June 2022 - July 2023 | NRs 0.67 Million | SITARA-HOMELAND JV |
Detailed Engineering Survey, Soil Investigation, Detailed Design and Report Preparation of as Mentioned below Motorable Bridges (Contract ID: LIDPO/BUT/RFP/MB/01/2078-79)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rupandehi | Department of Local Infrastructure/ Local Infrastructure Development Project Office | June 2022 - July 2023 | NRs 7.68 Million | SITARA-DRMS Jv |
Detailed Engineering Survey, Hydrological Study and Detailed Design of Bailey Bridges for Jagdulla PRoR Hydroelectric Project(106MW)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dolpa District Karnali Province | Jagdulla Hydropower Company Limited | August 2022 - September 2022 | NRs 1.92 Million | SITARA |
Detailed Engineering Survey, Geotechnical Investigation and Hydrological, design and estimate works (Detailed DPR) of Bridges at Province-1 & Karnali Province
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Province-1 and Karnali Province | Local Roads Bridge Programme(LRBP) | December 2019 - December 2020 | NRs 3.36 Million | SITARA |
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of the bridges, Gorkha, Parbat, Lamjung, Baglung, Kaski and Arghakhachi District, (Package No: - BB-DSD-159-073/74-15)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Parbat, Argakhachi, Lamjung, Baglung, Kaski | DOR/BB | December 2017 - July 2020 | NRs 12.59 Million | SITARA-CIS JV |
Detailed Engineering Survey, Soil Investigation, Designs, Cost Estimates, and Preparation of Detailed Project Report (DPR) of Bheri River Bridge over Radibazar-Jajarkot Road in Rukum (west)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rukum | Aathbiskot Municipality | September 2019 - January 2020 | NRs 0.75 Million | SITARA-Engineerko Ghar JV |
Feasibility study, detailed engineering survey, soil investigation and detailed design of the following bridges. 1. Ghorkuna Motorable Bridge and 2. Firkekhola Bridge
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kaski | PMC | February 2018 - July 2018 | NRs 1.23 Million | SITARA |
Detailed Survey, soil investigation, Detailed Design and cost estimate of different bridges. (Package no: BB-159-DSD-072/73-40)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Surkhet, Doti, Bajura | BB/DOR | June 2016 - June 2018 | NRs 9.56 Million | R&R-SITARA |
Detailed survey, soil investigation, detailed design and cost estimate of different bridges.
i. Dudaniya River Bridge,
ii. Jamuni Nadima Bridge,
iii. Gamariya Nadima Bridge,
iv. Baluwa Khola Bridge,
v. Belauti Khola Bridge,
vi. Jalad Bridge,
vii. Babudha Bridge,
viii. Saranchiya Bridge,
ix. Jallad Nadi Bridge,
x. Jamuni Khola Bridge
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dhanusa | MPT/DOR | June 2015 - July 2017 | NRs 8.62 Million | SITARA-R&R JV |
Feasibility Study, Detailed engineering survey, soil investigation, hydrological study and detailed design of bhoti Khola Moterable Bridge at chainage 4+500 km in Lamachaur-Machhapuchhar-Karuwa Road.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Pokhara | DTO Pokhara | April 2017 - June 2017 | NRs 0.8 Million | SITARA |
Consulting Services for Feasibility Study, Detailed Engineering Survey, Soil Investigation and Detailed Design of Mahakali Bridge, Contract No: BB-DSB-Mahakali-071/72
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kanchanpur, Dodhara | Bridge Branch/DOR | July 2016 - July 2017 | NRs 8.1 Million | CIAS-SITARA- CIS JV |
Design Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological study and Detailed Design of the bridges under Contract Package no. ACQMP/337145/071/072/005 (8 Numbers)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Along Kaligandaki Corridor | Bridge Branch, DOR | August 2015 - August 2016 | NRs 6.4 Million | TSE-SITARA-Material Test JV |
Feasibility Study Detailed Engineering Suevey Soil investigation Hydrological Study and Detailed Design of Deukhali Bagmara Bridge Rolpa
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rolpa | DOR | April 2014 - June 2014 | NRs 0.66 Million | SITARA |
Site Investigation and necessary redesign of Lambu Bridge, Terathum and Dyadigad Bridge, Doti
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Terthum and Doti | LRBP | January 2013 - September 2013 | NRs 0.58 Million | SITARA and GEC JV |
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Chaukaha Bridge over Jhimruk River in Pyuthan District.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Pyuthan | DDC Pyuthan | March 2012 - October 2012 | NRs 0.722 Million | SITARA |
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Khaireni (Tulsipur) Khola and Pampha (Uttarakhanda) Khola RCC Bridge of Chitwan District
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Chitwan | DDC Pyuthan | March 2012 - October 2012 | NRs 0.832 Million | SITARA |
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Moterable Bridges in Morang and Jhapa District. (Package No-3) (11 Number Bridges)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Morang & Jhapa | BP/DOR | July 2009 - February 2010 | NRs 4.9 Million | TIME JV SITARA |
Environmental Impact Assessment (EIA) of
1. Chatara-Leghuwaghat(Koshi Corridor) Road Section(47 Km) and
2. Chatara-Mulghat (Koshi Corridor) Road Section(35 Km) under Package No:DOR/GESU/337/073/74/045
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sunsari | DOR/GESU | December 2017 - August 2023 | NRs 1.25 Million | SITARA-HOMELAND JV |
Preparation of Detailed Project Report(DPR) and Initial Examination(IEE) of Road Sections of Outer Ring Road (55KM) RFP No:TMO/NCB/CS-01/2076-077.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kailali | Tikapur,Municipality | January 2020 - March 2021 | NRs 1.76 Million | SITARA-ENGINEER |
Detailed Engineering Survey, Design of Road, Report Preparation(DPR) and Initial Environmental Examination(IEE)” of Jogbudha-Rupal Section of Madan Bhandari Highway
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dadhaldhura | Madan Bhandari Highway Project Directorate | August 2019 - January 2021 | NRs 1.58 Million | SITARA |
Initial Environmental Examination (IEE) For Upgrading of Melamchi-Bhotang (Melamchi-Dhap) Road Section, (10. 445 Km), Province No. 3, Sindhupalchowk
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sindhupalchowk, Nepal | Road Division office Charikot/DOR/GESU | March 2019 - October 2019 | NRs 0.34 Million | SITARA |
Initial Environmental Examination (IEE) Study of Package No:- DOR/GESU/337/073/74/026.
i) Chainpur Padesh Kailash Road (18 Km),
ii) Chainpur Jayprithivi Darchula Road (19 Km),
iii) Chainpur Dipayal Khuriya Section (15 Km),
iv) Bitthal-Bungal-Bijgada Branch Road (20 Km),
v) Martadi-Thamlek Road (19 Km)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Bajhang District | GESU/DOR | May 2017 - February 2019 | NRs 1.64 Million | SITARA |
Initial Environmental Examination (IEE) For Upgrading of Melamchi-Bhotang (Melamchi-Dhap) Road Section, (10. 445 Km), Province No. 3, Sindhupalchowk”
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sindhupalchowk, Nepal | Division Road Office Charikot | February 2019 - September 2019 | NRs 0.34 Million | SITARA |
Initial environmental examination (IEE) study for Lamosangu-Jiri Road (110 Km)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sindhupalchowk and Dolakha Districts | GESU/DOR | June 2014 - June 2016 | NRs 0.75 Million | Multi-SITARA JV |
Environmental Impact Assessment (EIA) Study of Seti Lok Marga (125 Km)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kailali,Doti and Achham Districts | GESU/DOR | January 2012 - November 2016 | NRs 2.5 Million | Multi-SITARA JV |
Initial environmental examination study for Chhepetar-Luitel-Thatipokhari-Lamjung road
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Gorkha | GESU/DOR | July 2013 - June 2014 | NRs 0.264 Million | SITARA |
Detailed Engineering Survey, Design and Report Preparation of under mentioned roads under contract number PMEU/33701123/079180/DPR-07
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Salyan and Bardiya | Department of Roads/Planning, Monitoring and Evaluation Section(PMES) | June 2023 - October 2023 | NRs 3.49 Million | SITARA-HOMELAND-EKG JV |
Detailed Engineering Survey, Design and Report Preparation (DPR) of Pharping Humane Phakhel Kulekhani Kalanki Markhu Bajravarahi Kunchhal Tribhuwan Rajpath Sadak Ayojana, Kathmandu, Makawanpur Road(19.34 KM)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Makwanpur | Ministry of Physical Infrastructure Development, Bagmati Province | May 2022 - June 2022 | NRs 1.31 Million | SITARA |
Detailed Engineering Survey, Design and Report Preparation (DPR) of under mentioned roads under contract number Package PMEU/33701123/076/77/DPR-24
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Mugu | PMEU/DOR | July 2020 - April 2022 | NRs 3.978 Million | SITARA - HOMELAND JV |
Detailed Engineering Survey, Design of Road, and Preparation of Detailed Project Report (DPR) of Under Mentioned Road Contract ID MBHP/337011084/078/79/DPR-08
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Salyan | DOR, Madan Bhandari Highway Project Directorate | October 2021 - February 2022 | NRs 0.92 Million | SITARA |
Detailed Engineering Survey, Detailed Design and Preparation of Report (DPR) of Panchabajar Phutaha Jamuni Mankhola Goghat Road, Banke and Bardiya District. Contract ID PMEU/33701176/077/78/DPR-48
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Banke, Bardiya | PMEU/DOR | July 2021 - October 2021 | NRs 0.84 Million | SITARA |
Preparation of Detailed Project Report(DPR) and Initial Examination(IEE) of Road Sections of Outer Ring Road (55KM) RFP No:TMO/NCB/CS-01/2076-077.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Tikapur, Kailali | Tikapur Municipality | December 2019 - January 2021 | NRs 1.76 Million | SITARA-Engineerko Ghar JV |
Detailed Engineering Survey, Design (DPR) of Lagadhi Gadhiyani-Jamdaha Golbazar Nagarpalika Jamdaha-Madhya Pahadi Marga Udayapur Jilla ko Saghuri, Package No:PMEU/3371594/75/76/DPR-61
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Siraha | PMEU/DOR | September 2019 - October 2019 | NRs 1.04 Million | SITARA |
Detailed Engineering Survey, Design and Detailed Project Report(DPR) Preparation of Sukechare Barun Hariharpurgadi Ga.Pa. Dhimale Danda Hariban Road
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sarlahi | Ministry of Physical Infrastructure Development, Bagmati Province | June 2019 - July 2019 | NRs 0.864 Million | SITARA |
Detailed Engineering Survey,Design and Quantity & cost estimate of "Preparation of DPR of Khudi Siurung Syage Road" 31.627Km
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Lamjung | MRM/ORME | June 2019 - July 2019 | NRs 1.003 Million | SITARA-Engineerko Ghar JV |
Detailed Engineering Survey, Design and Quantity and cost estimate of Mude-Bagkhor-Kalapani Road Project. Contract No: Consult. 1/075/76
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sindhupalchowk | MPID/IDO | January 2019 - March 2019 | NRs 1.66 Million | SITARA |
Detailed Engineering Survey, Design and Report Preparation of Roads, Contract Package No: PMEU/337159/073/74 DPR-7
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Nuwakot, Kavreplanchowk, Bajhang | PMEU/DOR | May 2018 - December 2018 | NRs 6.4 Million | SITARA-HOMELAND JV |
Detailed Engineering Survey, Design of road and Report Preparation(DPR) of
i. BaluwaTakseraDhorpatanMyagdiSadak (30KM), Myagdi, Rukum,
ii. ChunwangRukumkotSisnedwariSadak(31 KM), Dolpa,
iii. GhandraGornetaKarkiGaunSection of Ghumichuli- RanibasKhadapKhariGhorneta-Jajarkot Road (20KM), Surkhet,
iv. LumdiKholaPipaldandaDhandGairaLimghaKafalDandaSatyawati Sadak, (13KM), Gulmi,
v. SiddhicharanLokmargaDekhiJilla KaragarGhumtiHudaiRumjatarBimansthanSadak, (7km), Okhaldhunga
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rukum, Surkhet,Gulmi, Okhaldhunga | MPIT/DOR | September 2016 - June 2017 | NRs 7.35 Million | SITARA-HOMELAND JV |
Detailed Engineering Survey, Design of road and Report Preparation(DPR) of:
i. KarkiNetaBhangaraThanamaulaLumkhuWaalkotHosRandiBeu,
ii. Kusma, Na. Pa. 11 BarpipalPakhaGhumtiKhariyaSadak, (5.5km), Parwat,
iii. BetiniMohariyaLasibot Tangle Bhukjhing Barang Sadak, (19 km)libaasUraam TaaltumRaskotPurtighatSadak, (15 km), Parwat,
iv. MakaisinghKutarrGhairungNamphungBungkotGorkha Sadarmukam Sadak, (19 km), Gorkha,
v. RuilaSamagaunSidhibasSadak, (15.5 km), Gorkha,
vi. ArughatArbang ThumilapuSadak (10km), Gorkha,
vii. KyaminChhapthokMarga (12km), Tanahu
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Parwat, Gorkha, Tanahu | MPIT/DOR | May 2017 - June 2018 | NRs 8.4 Million | SITARA-HOMELAND JV |
Detailed Engineering Survey, Design and Report Preparation of Chandanda-Diverna-Khana-Khannadaha Road (Chainage 0+000-16+000 KM)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Arghakhanchi | TDO | October 2016 - December 2016 | NRs 0.86 Million | SITARA |
Detailed Engineering Survey, Design and report preparation of Gachhe Dhikura Dhanachaur,Lamtal Road (48.76 Km) in Arghakhanchi District.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Arghakhanchi | DCC Arghakhanchi | December 2016 - February 2017 | NRs 2.5 Million | SITARA |
Detailed Engineering Survey, Design and report preparation of roads in Doti, Kalikot, Surkhet and palpa districts.,
(i) Khulalu Lalu Kasa Laifu Kalikot Road (22.78 Km),Kalikot,
(ii) Jamphu Phant Pipalneta Panchtale Gufa Hanse Gaun Thada Gada Dhankot Jungleghat Sadak (19.55 Km), Surkhet,
(iii) Silgadi Okharbot- Osile Baglev Jinnana Khaptad Sadak (30.08 Km),Doti,
(iv) Lalighat Santurali Bhimansthal Triveni Badimalika Sadak (34.8 Km),Kalikot,
(v)Saljhandi Surunge Dhunga Sadak (12.18 Km),Palpa
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Doti, Kalikot, Surkhet, Palpa | MOPIT/DOR | June 2017 - December 2017 | NRs 8.314 Million | SITARA-HOMELAND JV |
Detailed Engineering Survey Design and Report Preparation of Roads of
(i) Mariayaghat-Thapapur-Jhabani-Baniya-Sadakpur Sadak, Kailali (28.14 Km),
(ii) Gulariyaghat Bhajani Mude, Kailali (8.8 Km),
(iii) Chandan Chauki-Phulbari-Chaumala MRM Sadak, Kailali (31.6 Km),
(iv) Tikapur Dudjhari MRM Section, Kailali (14.00 Km),
(v) Kothiya Thakurdwara-Amreni Sadak, Bardiya (20.64 Km),
(vi) Bichhya Naka-Aama Bardiya Dhanaura-Orali Bajar-Aampur-Dalla-Thakurdwara-Ambasa Sadak, Bardiya (25.00 Km), Contract ID: PMEU/337366/073/74 DPR2
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kailali and Bardiya District | PMEU/DOR | January 2017 - April 2017 | NRs 5.312 Million | SITARA-Homeland JV |
Detailed Engineering Survey, Design and Report Preparation of Roads of
(i) Mahendranagar (Dhanusa)-Gaushala-Haripurwa-Malangwa (Sariahi) Adhuro Sadak, Mahottari (39.95 Km),
(ii) Kusum Khola Mainadi Mujhung Amalabaas Sadak, Palpa (47.91 Km),
(iii) Chandan Nath 8-ko Mul Sadak Talimahat Caunko Pul-Chiyalghat Sadak, Jumla (0.44 Km), Contract ID: PMEU/337159/072/73 DPR 27
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dhanusa, Sarlahi, Mohattari, Palpa and Jumla District | PMEU/DOR | September 2016 - July 2017 | NRs 5.47 Million | TSE-SITARA JV |
Detailed engineering survey, Design and Report Preparation of Nepaljung Bagauda Road Project.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Nepalgunj | Postal highway project | July 2015 - August 2015 | NRs 0.79 Million | SITARA |
Detailed Engineering Survey, Design and cost estimate of Liwang-Dhawang-Jaljala-Thawang Road
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rolpa | MWRRD/DOR | April 2015 - June 2015 | NRs 0.83 Million | SITARA |
Detailed Engineering Survey and Design of Highway and other Structures (for Upgrading of this Section to Blacktop Standard) and Preparation of Detailed Project Report (DPR) of Burtibang – Patihalne Section of Mid Hill Highway in Baglung District
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Baglung District | Mid Hill West,(Puspalal) Highway Project/DOR | February 2015 - December 2015 | NRs 1.97 Million | TSE-SITARA JV |
Detailed Engineering Survey, Detailed Design, Cost Estimate and DPR Preparation of Myanglung-Okhre-Sukrabare-Chaparichowk-Dagappa (30.6 km) Within Terhathum District (Contract ID: P-01-SNRTP (W2)-THE-MYA/2071-072)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Terhathum | SNRTP/DDC Terhathum | August 2015 - November 2015 | NRs 1.48 Million | CIAS-SITARA-EOCODE |
Detailed Engineering Survey, Detailed Design, Cost Estimate and DPR Preparation of Isibu-Samdu-Khamlalung-Sangkranti (30 km) Within Terhathum District (Contract ID: P-02-SNRTP (W2)-THE-MYA/2071-072
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Terhathum | SNRTP/DDC Terhathum | August 2015 - November 2015 | NRs 1.471 Million | CIAS-SITARA-EOCODE |
Detailed Engineering Survey, Design and report preparation of Gachhe Dhikura Dhanachaur,Lamtal Road (48.76 Km) in Arghakhanchi District.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Argakhanchi District | DCC Arghakhanchi | December 2016 - February 2017 | NRs 2.5 Million | SITARA |
Detailed Engineering Survey and Design of Highway and other Structures (for Upgrading of this Section to Blacktop Standard) and Preparation of Detailed Project Report (DPR) of Patihalne - Rukumkot Section of Mid Hill Highway in Rukum District
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rukum District | Mid Hill West,(Puspalal) Highway Project/DOR | February 2015 - December 2015 | NRs 2.03 Million | TSE-SITARA JV |
Detailed Engineering Survey, Design and Report Preparation of Following Roads:
1. Aathrai Mansaari Thoklung Fedaam Ekikrit Road (Terhathum),
2. Kawasoti Bojhapokhari Dedhgaun Vimaad Khaireni Road (Tanahun Section)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Terhathum and Tanahun | PMEU/DOR | May 2015 - December 2015 | NRs 2.033 Million | TSE-SILT-SITARA JV |
Preparation of Detailed Project Report, DPR( i) Survey and Investigation and (ii) Detailed Design, Drawing and Cost Estimate of Upgrading Works of 1. Beteni- Majhkharka Road 14A003R (Ch. 6+000 to 16+000), 2. Ranibas – Rauta- Salle-Kurletar Road 14A005R (Ch. 0+000to 12+000), 3. Katari – Bahunitar – Barre Road 14A006R (ch. 0+000 to 10+000) and 4. Nepaltar – Udayapur – Kurkuntar Road 14A013R (ch. 0+000 to 8+500) in Udayapur District Under SNRTP Programe (Tatal Road Length 40.50 km)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Udayapur | DDC Udayapur | March 2015 - November 2015 | NRs 1.62 Million | SITARA - EcoCoDe - SLATE-JV |
Detailed Engineering Survey, DCP Test, Design of Roads, Concise IEE Study and DPR Preparation of Patauti – Kharjyang – Tamghas Road (35.5 km) in Arghakhachi and Gulmi District.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Arghakhachi and Gulmi | SSDRP/DOR Sandhikharka, Arghakhachi | June 2015 - July 2015 | NRs 2.406 Million | SITARA-TSE-BN-JV |
Detailed Design for Upgrading of Highway to Blacktop Standard(Review of Mid Hill Highway Project and provision of access points to its corridor, Detailed Engineering Survey and Design of Highway and Other Structures and Preparation of Detailed Project Report (DPR) of Hatiya-Burtibang Section of Mid Hill Highway in Baglung District.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Baglung | Mid Hill West,(Puspalal) Highway Project/DOR | November 2013 - May 2014 | NRs 3.98 Million | TSE-SITARA JV |
Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Panchthar | Mid Hill Highway Project, Eastern Sector/DOR | March 2013 - February 2014 | NRs 4.48 Million | TSE-SITARA JV |
Detailed Design Engineering Survey, Design and Preparation of Detailed Project Report(DPR) of Beltarbazar-Kamphughat-Pamakham Bhanjyang-Temke-Sapsudhap-Mayur Dand-Salpa Pokhari-Gudel to Solu Salleri Road
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Khotang, Bhojpur and Solukhumbhu Districts | Asset Management, Contract Management and Quality Control Project, Department of Roads | April 2014 - September 2014 | NRs 7.1412 Million | TSE- Tech-SITARA(JV) |
Consulting Services for Detailed Engineering survey DCP Test Design of roads, concise IEE Study and DPR Preparation of Lamu Sanghu Jiri Road Sindhupkhowk , Dolakha (117Km ) ( package no PMUE - 337\ 069\070- Dpr -1)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sindhupalchowk, Dolakha | PMEU/DOR | July 2013 - June 2014 | NRs 6.938 Million | TAEC-TSE Tech - SITARA JV |
Detailed Survey, Engineering Design, Cost Estimattion and Report Preparation of Num-Kimathanka Sector (45.5 Km) Khadbari, Sankhuwa
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sankhuwasava | DOR | July 2010 - April 2011 | NRs 1.205 Million | SITARA |
Local Road Asset Management Consultant in Shankhuwasava District
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sankhuwasabha District | Rural access Program, Phase 3 | February 2014 - April 2015 | NRs 12.23 Million | GEC-SITARA JV |
Construction Supervision of Upgrading Works of following roads (Package D) in Rajbiraj and Saptari District:
(i) Rajbiraj – Sankhada Road,
(ii) Rajbiraj - Rupani Road,
(iii)Rajbiraj – Bhardah Road (41.97 Km)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Saptari | DOR / RIP | October 2012 - November 2014 | NRs 15.93 Million | GEC-MULTI_SITARA Nepal Consult JV |
Detailed Engineering Design, IEE, DPR and Construction Supervision of :
(i) I.Na.Pa.-Dhudhang-Soyang-nayabazar Road (7.12 Km),
(ii)Rajduwali-Chisapani-Dhanabari Road (23.3 Km) and
(iii)Mangalbare -Ivang Road (19.9 Km)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Ilam | ADB/RRRSDP /DDC Ilam | February 2009 - June 2013 | NRs 13.437 Million | JV EAST |
Detailed Engineering Design, IEE, DPR Preparation and Construction Supervision of :
(i) Hile-Utterpani-Chhintangn Road (23.9 Km),
(ii) Trishule - Hattikharka - Jitpur Road (20.16 Km),
(iii) Raja Rani - 6 No. Budhabare Road (26.08 Km) and
(iv) 6 No. Budhabare - Phirkaule (3.40 Km)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dhankuta | ADB/RRRSDP/DDC Dhankuta | March 2009 - June 2013 | NRs 13.917 Million | JV EAST |
Detailed Feasibility Study of Ground Water Irrigation Project at Different Rural Municipality/Municipality in Kailali and Kanchanpur Districts.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kailali and Kanchanpur | Department of Water Resources and Irrigation, Prosperous Terai Madhesh Irrigation Special Program | June 2021 - February 2022 | NRs 1.553 Million | SITARA |
Detailed Feasibility Study of Ground Water Irrigation Project at Different Rural Municipality/Municipality in Sunsari and Morang Districts
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Morang and Sunsari | Department of Water Resources and Irrigation, Prosperous Terai Madhesh Irrigation Special Program | June 2021 - January 2022 | NRs 1.695 Million | SITARA |
Detailed Survey, Engineering Design and Cost Estimate of Sapsu Khola Dandakharka Lift Irrigation Project
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Khotang | Water Resources and Irrigation Development Division Khotang | November 2021 - March 2022 | 0.415 | SITARA |
Prefeasibility Study of Tamor Chisyang Diversion Multipurpose Project
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Terhathum, Panchthar, Morang, Sunsari, Jhapa | Department of Irrigation | June 2020 - June 2021 | NRs 5.23 Million | SITARA- Shah-DSC |
Detailed feasibility study of Micro Hydro Operated Lift Irrigation System
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Bajura | AEPC | June 2019 - July 2019 | NRs 1.78 Million | SITARA |
Alternative Study between surface canal and tunnel conveying system from Babai River to provide year round irrigation (YRI) in 15000 ha and study the impact of climate change in Crop Water Requirement (CWR)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Surkhet, Banke and Bardiya | BBDMP | March 2019 - June 2019 | NRs 1.69 Million | SITARA |
Feasibility Study including Preparation of Detailed Project Report Preparation of Bheri Corridor Irrigation Development Project (con 01/BCIDP/BBDMP/073-74)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Surkhet and Salyan | BBDMP | June 2017 - August 2018 | NRs 5.7 Million | ERMC-SILT-SITARA JV |
Detailed Planning and Engineering Design of Branch Canals and Associated Command Area Development Downstream of Ch. 35+000 Km of Sikta IP (14,400 ha)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Banke | DOI/SIP | December 2015 - May 2017 | NRs 19.77 Million | CMS-FBC-SITARA JV |
Detailed Engineering Survey, Design and Cost Estimate for the Rehabilitation of Banganga Irrigation System (6350 ha) (Package Number: BIMD/072-73/CS
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kapilbastu | Jawalakhel, Lalitpur | June 2016 - May 2017 | NRs 2.768 Million | ERMC-SILT-SITARA JV |
The study of the utilization of the water resources along the downstream of Budhi Gandaki Hydro-electric project
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Gorkha and Dhading | BGHP | June 2015 - June 2016 | NRs 3.35 Million | FBC JV SITARA |
Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Ramechhap District
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Ramechhap District | LILI / HELVETUS | July 2013 - July 2014 | NRs 1.014 Million | SITARA |
Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Khotang District
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Khotang District | LILI / HELVETUS | July 2013 - July 2015 | NRs 2.174 Million | SITARA |
Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Dailekh District
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dailekh District | LILI / HELVETUS | July 2013 - July 2016 | NRs 1.014 Million | SITARA |
Detailed Feasibility study of Jhimrukh Dabur Irrigation Project Bangesal VDC Puythan
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Puythan | DOI | June 2014 - October 2014 | NRs 0.48 Million | SITARA |
Planning and Design of Typical Lift Irrigation System using Solar Power in Bheri Corridor Area
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Surkhet District | Bheri Babai Irrigation Project /DOI | March 2014 - August 2014 | NRs 0.299 Million | SITARA |
Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2011/12.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dailekh, Okhaldhunga, Jajarkot District. | LILI/HELVETAS | February 2012 - February 2013 | NRs 3.03 Million | SITARA |
Pre-Feasibility Study of Sunkoshi - Marin Diversion Project
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sarlahi, Mahottari, Bara, Rautahat, Dahnusha and Sindhuli | DOI | July 2012 - June 2013 | NRs 3.658 Million | FBC JV SITARA |
Detailed Feasibility Study of the Extension of the Eastern main Canal of Bagmati Irrigation Project.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sarlahi, Mahottari, Bara, Rautahat and Dahnusha | DOI | July 2012 - June 2013 | NRs 1.47 Million | FBC JV SITARA |
Pre-feasibility Study of Madi-Dang Diversion Project
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Surkhet | DOI Surkhet | April 2010 - May 2011 | NRs 4.06 Million | CEMECA JV SITARA |
Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different District in F/Y 2010/11.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Khotang,Dailekh,Jajarkot & Achham Distict | LILI/HELVETAS | December 2010 - November 2011 | NRs 3.8 Million | SITARA |
Preparation of Asset Management Plan and Financial Management Plan of IWRMP Component B.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kailali | DOI/IWRMP | June 2010 - October 2010 | NRs 1.2 Million | SITARA |
Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kalikot and Achham district | LILI/HELVETAS | April 2010 - July 2010 | NRs 1.55 Million | SITARA |
Carrying out Detail Engineering Survey, Design & Cost Estimates of Road, Drainage System & Sewerage System at Phaplu, Solududhkundh Na.Pa. (RFP No: DPR/PUDBC/OKHALDHUNGA/RFP/80/81-01)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Solukhumbu | PUDBC/ Okhaldhunga | August 2023 - September 2023 | NRs 1.24 Million | SITARA |
Pre-Feasibility Study for Potential ICD at Tin Do(Tinje) Dho(Dolpa) ICD” RFP No:NITDB/S/QCBS/18(2079/080)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dolpa | Nepal Intermodal Transport Development Board | March 2023 - June 2023 | NRs 1.99 Million | SITARA |
The Preparation of Detailed Project Report (DPR) of Integrated Land Development Land Development (Land Pooling) at Lumbini Provincial Capital City, Dang Valley Package 3
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rapti Valley, Deukhuri,Dang | Provincial Infrastructure Development Authority (PIDA) | February 2023 - February 2025 | NRs 3.13 Million | SITARA-ECOCODE-MILESTONE JV |
The Preparation of Detailed Project Report (DPR) of Integrated Land Development Land Development (Land Pooling) at Lumbini Provincial Capital City, Dang Valley Package 1
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rapti Valley, Deukhuri,Dang | Provincial Infrastructure Development Authority (PIDA) | February 2023 - February 2025 | NRs 9.1 Million | SITARA-ECOCODE-MILESTONE JV |
Water-Induced Multihazard Assessment for Urban Land-Use Planning
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Bhaktapur, Nepal | Water Resources Research and Development Centre | February 2023 - July 2023 | NRs 1.85 Million | SITARA |
Pre-Feasibility Study for Potential ICD at Olanchung Gola (Taplejung) RFP No:NITDB/S/QCBS/05/2078/079
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Taplejung, Nepal | Nepal Intermodal Transport Development Board | April 2022 - July 2022 | NRs 1.81 Million | SITARA |
Detailed Feasibility Study for Relocation of Selected Settlements of Dolakha, Sindhupalchowk, Kavre, Okhaldhunga and Ramechhap Districts (Contract ID no. MOUD/CLPIU/NRF/Services.07/74-07)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dolakha, Sindhupalchowk, Kavre, Okhaldhunga and Ramechhap | Ministry of Urban Development, CLPIU | July 2017 - July 2019 | NRs 7.6 Million | SITARA-CIAS JV |
Preparation of Master Plan of Lumbini Provincial Capital City (LPCC), Rapti, Dang (including DPR of Various Buildings, Preparation of Norms, Standards and Building Regulation and By-Law).
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dang, Pyuthan and Arghakhanchi District | Provincial Development Authority (PIDA), Lumbini Province | April 2021 - April 2022 | NRs 7.96 Million | SITARA-ECoCoDE-Technocrat JV |
Detailed Master Plan, Detailed Topographical Survey & Detailed Project Report of Madan Ashrit Smriti Park at Dashdhunga(DOT/NCB/CS-1/077-78)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dashdhunga, Chitwan | Department of Tourism | March 2021 - October 2021 | NRs 2.27 Million | SITARA-ECOCODE-FBC JV |
Preparation of Master Plan and Detailed Engineering Design of Commercial Market Complex in Bheemdatt Municipality, Kanchanpur (Contract ID: RFP/01/2075-76)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Mahendranagar, Kanchanpur | Bheemdatt Municipality | March 2019 - July 2019 | NRs 2.84 Million | SITARA |
Detailed Project Report (DPR) Preparation for the Infrastructure Development of Agriculture Market Package 1: Itahari (Sunsari), Rangeli (Morang), Hetauda (Makwanpur)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sunsari, Hetauda, Makwanpur | Central for Agricultural Infrastructural Development and Mechanization Promotion | April 2019 - July 2019 | NRs 5.98 Million | SITARA |
Preparation of Master Plan of Danda Kharka Landslide, Melung Rural Municipality-5, Dolakha District.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dolakha | GON/VLMP | April 2017 - July 2018 | NRs 1.45 Million | SITARA |
Feasibility Study and Topography Survey of the ICD at Dodhara Chadni Area and Development of Conceptual Plan (Contract No: NITDB/CS/01 (073/74)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kanchanpur | NITDB | July 2017 - April 2018 | NRs 2.43 Million | SITARA |
Preparation of green park master plan and detailed engineering design and estimation of major infrastructures includes View Tower,Culvert and Swimming Pool.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Jeetpur -Simara | JSMC | June 2017 - July 2017 | NRs 1.93 Million | SITARA |
Detailed Site Assessment, Preparation of Master Plans and Technical Documents for Reconstruction of different Schools (10 Numbers) in Sindupalchok District.
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sindupalchok District | CARITAS Switzerland | September 2015 - June 2017 | NRs 2.357 Million | SITARA |
Detailed Site Assessment, Topographic Survey, Detailed Architectural Design, Detailed Structural Design, Preparation of BOQ, Cost Estimate and Technical Documents for Reconstruction of Three Schools in Kavrepalanchowk, Dolakha and Sindhuli Districts
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kavrepalanchowk, Dolakha and Sindhuli Districts | Terres des homes Germany | August 2016 - May 2017 | NRs 0.76 Million | SITARA |
The study for the preparation of Catchment Area Development and Protection Plan for the Project Including Watershed Management Plan for Budi Ganga Hydropower Project
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Achham | BGHP | April 2016 - July 2016 | NRs 0.949 Million | SITARA |
Feasibility Study of Resettlement Development nearby proposed Ring Road area of Budhi Gandaki Hydroelectric Project in Gorkha and Dhading Districts (Job No.-2071/72-3)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Gorkha and Dhading | BGHP | June 2015 - July 2016 | NRs 3.798 Million | Full Bright-SITARA JV |
Preparation of District Transport Master Plan (DTMP) for Kathmandu, Bhaktapur and Lalitpur District (Contract No:RTI SECTOR_DTMP 001-0012)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kathmandu, Bhaktapur and Lalitpur District | RAP-3 | January 2013 - September 2013 | NRs 1.805 Million | SITARA |
Detailed Engineering Survey and Design of Access Road and Preparation of Master Plan of the Area to be Placed Radar System
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Lalitpur | CAAN | March 2012 - July 2012 | NRs 0.68 Million | SITARA |
Updating of District Transport Master Plan (DTMP) & District Transport Master Plan (DTPP) of Kaski District
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Kaski | DDC Kaski | August 2010 - April 2011 | NRs 0.799 Million | SITARA Technocrat Consult JV |
Preparation of Master Plan for Tinau River Integrated Development Works
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rupendehi | DWIDP/Rupendehi | May 2009 - August 2009 | NRs 2.22 Million | ERMC JV SITARA |
Detailed Project Report Preparation of Tungun Khola Lapsibot Dam, Konjyosom Rural Municipality-2 at Tungun Khola
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Lalitpur | Konjyosom Rural Municipality | March 2023 - June 2023 | NRs 1.79 Million | SITARA |
Preparation of Detail Project Report for Lamiraha Multipurpose Dam at Sainamaina, Rupandehi
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Rupandehi | Project Implementation Unit, President Chure Terai Madhesh Conservation Development Board | November 2020 - November 2021 | NRs 6.04 Million | ITECO-SITARA-ENGINEERKO GHAR JV |
Review and Verification of Data in EHRP-MIS of IDA Beneficiaries Contract ID No: NP-NDRRMA-311400)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Nepal (Earthquake affected Districts)s | NDRRMA/EHRP/PMU | November 2022 - April 2023 | NRs 1.43 Million | SITARA |
Consulting Services for Review and Verification of Data in EHRP-MIS of IDA Beneficiary Contract ID: NP-NDRRMA-278179-CS-CDS
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Nepal (Earthquake affected Districts) | NDRRMA, Earthquake Housing Reconstruction Project, Project Implementation Unit/ | April 2022 - June 2022 | NRs 2.88 Million | SITARA |
Review and Verification of Data in NRA-MIS of IDA Beneficiary
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Nepal (Earthquake affected Districts) | Earthquake Housing Reconstruction Project, National Reconstruction Authority | June 2020 - December 2021 | NRs 10.57 Million | FBC-SITARA-DSC JV |
Third Party Monitoring Agent (TPMA) for Project Level Compliance Monitoring on Implementation of Environmental and Social Safeguard (Contract ID No.: EHRP/NRA/S/CQS-01/2076-77)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dhading, Dolakha, Nuwakot, Gorkha, Rasuwa, Kavrepalancchok, Sindhupalchowk, Ramechhap, Okhaldhunga, Sindhuli, Makawanpur, Bhojpur, Chitawan, Gulmi, Kaski, Khotang, Lamjung, Palpa, Parbat, Solukhumbu, Syangja, and Tanahu | Earthquake Housing Reconstruction Project (EHRP), Central Level Project Implementation Unit (CLPIU), Government of Nepal | November 2020 - November 2021 | NRs 14.24 Million | FBC-SITARA-DSC JV |
Monitoring and Evaluation of Earthquake Hosing Reconstruction Project (EHRP) (Contract ID: EHRP/NRA/S/QCBS-32/2075-76)
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Dhading, Dolakha, Gorkha, Kavrepalanchowk, Makwanpur, Nuwakot, Okhaldhunga, Ramechhap, Rasuwa, Sindhuli and Sindhupalchowk districts | Earthquake Housing Reconstruction Project, National Reconstruction Authority | May 2019 - December 2020 | NRs 72.62 Million | FBC-SITARA-DSC JV |
DGPS Survey and Drone Survey of Lower Isuwa Khola Hydropower project 37.7MW
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Sankhuwasabha | ISUWA ENERGY P.LTD. | April 2019 - July 2019 | NRs 5.27 Million | SITARA |
Detailed Design of Optimum Snow and Glacier Hydro-meteorological Network. RFP No. DHM/C/RFP/08-2077/78).
Location | Client/Finance | Period | Value of service | Remark |
---|---|---|---|---|
Nepal | Ministry of Water Supply, Energy and Irrigation | April 2021 - July 2022 | NRs 1.94 Million | INCLUSIVE-NHMRCC-SITARA JV |