P.O. Box 2458
Patan Dhoka, Lalitpur, Nepal
Working experience with major donors/aid agencies.
Location: Mugu District
Client: DDC Mugu
Start Year: 2007
End Year: 2008
Project Title: Detail Survey, Design, and Preparation of report of Drinking Water Supply Schemes for the Office of DDC Mugu (10 Schemes)
Location: Mustang District
Client: DDC Mustang
Start Year: 2007
End Year: 2007
Project Title: Detailed Design, Drawing, Cost Estimate of Dharmasala Building at Muktinath
Location: Sindhupalchowk
Client: Caritas
Start Year: 2007
End Year: 2018
Project Title: Detailed site assessment of different schools for reconstruction of schools in Sindhupalchowk districts. (9 schools)
Project Title: Preparation of Technical Documents ,BOQ and Cost Estimate of 12 Schools
Location: Ramechhap District
Client: UNDP/REDP/KIND Project
Start Year: 2008
End Year: 2008
Project Title: Detail survey, design , Cost estimate and Preparation of Tender document of Transmission and distribution of Haluwa Khola Mini Hydro Project (400KW), Five VDCS of Ramechhap.
Location: Ilam District
Client: NCDC
Start Year: 2008
End Year: 2010
Project Title: Feasibility Study of 8 micro Hydro Power Projects
Location: Dhankuta
Client: ADB/RRRSDP/DDC Dhankuta
Start Year: 2009
End Year: 2013
Project Title: Detailed Engineering Design, IEE, DPR Preparation and Construction Supervision of : (i) Hile-Utterpani-Chhintangn Road (23.9 Km), (ii) Trishule - Hattikharka - Jitpur Road (20.16 Km), (iii) Raja Rani - 6 No. Budhabare Road (26.08 Km) and (iv) 6 No. Budhabare - Phirkaule (3.40 Km)
Location: Ilam
Client: ADB/RRRSDP /DDC Ilam
Start Year: 2009
End Year: 2013
Project Title: Detailed Engineering Design, IEE, DPR and Construction Supervision of : (i) I.Na.Pa.-Dhudhang-Soyang-nayabazar Road (7.12 Km), (ii)Rajduwali-Chisapani-Dhanabari Road (23.3 Km) and (iii)Mangalbare -Ivang Road (19.9 Km)
Location: Morang & Jhapa
Client: BP/DOR
Start Year: 2009
End Year: 2010
Project Title: Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Moterable Bridges in Morang and Jhapa District. (Package No-3) (11 Number Bridges)
Location: Rukum District
Client: MOST/AEPC/ESAP
Start Year: 2009
End Year: 2010
Project Title:Detail survey , design and Preparation of Detailed Project Report (DPR) of Simrutu Khola Mini Hydro Project (200 kW) ,Rukum
Location: Sankhuwasava
Client: DOR
Start Year: 2010
End Year: 2011
Project Title:Detailed Survey, Engineering Design, Cost Estimattion and Report Preparation of Num-Kimathanka Sector (45.5 Km) Khadbari, Sankhuwa
Location: Kaski
Client: DDC Kaski
Start Year: 2010
End Year: 2011
Project Title:Updating of District Transport Master Plan (DTMP) & District Transport Master Plan (DTPP) of Kaski District
Location: Kalikot and Achham district
Client: LILI/HELVETAS
Start Year: 2010
End Year: 2010
Project Title:Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)
Location: Kailali
Client: DOI/IWRMP
Start Year: 2010
End Year: 2010
Project Title:Preparation of Asset Management Plan and Financial Management Plan of IWRMP Component B.
Location: Khotang,Dailekh,Jajarkot & Achham Distict
Client: LILI/HELVETAS
Start Year: 2010
End Year: 2011
Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2010/11.
Location: Surkhet
Client: DOI Surkhet
Start Year: 2010
End Year: 2011
Project Title:Pre-feasibility Study of Madi-Dang Diversion Project
Location: Lalitpur
Client: DoLIDAR/MoLD
Start Year: 2010
End Year: 2010
Project Title:Preparation of Implementation Guideline and Technical Manual for Implementation of Micro Hydro Schemes.
Location: Achham,Bajura, Doti,Dadeldhura, Gulmi,Arghakhachi, Syangja & Palpa Districts
Client: AEPC/MOEn
Start Year: 2011
End Year: 2011
Project Title:Mapping of Micro Hydropower (MMHP) and Preparation of District Electrification Master Plan (DEMP) in Achham,Bajura, Doti,Dadeldhura, Gulmi,Arghakhachi, Syangja & Palpa Districts.
Location: Kavre, Sindhupalchowk, Dolakha, lalitpur, Khotang,Dhankuta & Terathum Districts
Client: AEPC/MOEn
Start Year: 2011
End Year: 2011
Project Title:Mapping of Micro Hydropower (MMHP) and Preparation of District Electrification Master Plan (DEMP) in Kavre, Sindhupalchowk, Dolakha, lalitpur, Khotang,Dhankuta & Terathum Districts
Location: Bajura & Achham
Client: AEPC
Start Year: 2011
End Year: 2011
Project Title:Conduct the Capacity Building of Stakeholders on Mini/Micro Hydropower Development in the Special District (Bajura & Achham)
Location: Rautahat
Client: TDF
Start Year: 2011
End Year: 2015
Project Title:Construction Supervision of Gaur Bus Terminal Project (Project No-K3L-001-CS/K#SL-002-CS/K#G-001-C) Gaur,Rautahat District
Location: Saptari
Client: DOR / RIP
Start Year: 2012
End Year: 2014
Project Title:Construction Supervision of Upgrading Works of following roads (Package D) in Rajbiraj and Saptari District: Rajbiraj – Sankhada Road,Rajbiraj - Rupani Road,Rajbiraj – Bhardah Road (41.97 Km)
Location: Kailali,Doti and Achham Districts
Client: GESU/DOR
Start Year: 2012
End Year: 2016
Project Title:Environmental Impact Assessment (EIA) Study of Seti Lok Marga (125 Km)
Location: Chitwan
Client: DDC Pyuthan
Start Year: 2012
End Year: 2012
Project Title:Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Khaireni (Tulsipur) Khola and Pampha (Uttarakhanda) Khola RCC Bridge of Chitwan District
Location: Pyuthan
Client: DDC Pyuthan
Start Year: 2012
End Year: 2012
Project Title:Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Chaukaha Bridge over Jhimruk River in Pyuthan District.
Location: Lalitpur
Client: CAAN
Start Year: 2012
End Year: 2012
Project Title:Detailed Engineering Survey and Design of Access Road and Preparation of Master Plan of the Area to be Placed Radar System
Location: Sarlahi, Mahottari, Bara, Rautahat and Dahnusha
Client: DOI
Start Year: 2012
End Year: 2013
Project Title:Detailed Feasibility Study of the Extension of the Eastern main Canal of Bagmati Irrigation Project.
Location: Dailekh, Okhaldhunga, Jajarkot District.
Client: LILI/HELVETAS
Start Year: 2012
End Year: 2013
Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2011/12.
Location: Sarlahi, Mahottari, Bara, Rautahat, Dahnusha and Sindhuli
Client: DOI
Start Year: 2012
End Year: 2013
Project Title:Pre-Feasibility Study of Sunkoshi - Marin Diversion Project
Location: Kathmandu
Client: Dolidar
Start Year: 2012
End Year: 2012
Project Title:Preparation of Strategic Plan for the Development of Micro Hydro through Dolidar
Location: 53 Districts of Nepal
Client: AEPC
Start Year: 2012
End Year: 2012
Project Title:Compilation of Mapping of Micro Hydropower and District Electrification Master Plan (MMHP & DEMP) Report and Upgrading in GIS of 53 Districts of Nepal.
Location: Nepal
Client: AEPC
Start Year: 2012
End Year: 2012
Project Title:Study on Technical Standards for Grid Connection of Micro Hydro in Nepal.
Location: Palpa
Client: REDA
Start Year: 2012
End Year: 2012
Project Title:Detailed Feasibility Study of Micro hydropower Projects
Location: Mugu
Client: DDC Mugu
Start Year: 2012
End Year: 2012
Project Title:Detailed Engineering Survey, Design and Report Preparation of sukhadhik Khola MHP
Location: Syangja
Client: TDF
Start Year: 2012
End Year: 2012
Project Title:Construction Supervision of Shree Kajiman Hari-Tika Higher Secondary School Building in Putalibazar Municipality, Syangja (Project Doce No-K2G-059-CS)
Location: Sindhupalchowk, Dolakha
Client: PMEU/DOR
Start Year: 2013
End Year: 2014
Project Title:Consulting Services for Detailed Engineering survey DCP Test Design of roads, concise IEE Study and DPR Preparation of Lamu Sanghu Jiri Road Sindhupkhowk , Dolakha (117Km ) ( package no PMUE - 337\ 069\070- Dpr -1)
Location: Panchthar
Client: Mid Hill Highway Project, Eastern Sector/DOR
Start Year: 2013
End Year: 2014
Project Title:Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km
Location: Baglung
Client: Mid Hill West,(Puspalal) Highway Project/DOR
Start Year: 2013
End Year: 2014
Project Title:Detailed Design for Upgrading of Highway to Blacktop Standard(Review of Mid Hill Highway Project and provision of access points to its corridor, Detailed Engineering Survey and Design of Highway and Other Structures and Preparation of Detailed Project Report (DPR) of Hatiya-Burtibang Section of Mid Hill Highway in Baglung District.)
Location: Gorkha
Client: GESU/DOR
Start Year: 2013
End Year: 2014
Project Title:Initial environmental examination study for Chhepetar-Luitel-Thatipokhari-Lamjung road
Location: Terthum and Doti
Client: LRBP
Start Year: 2013
End Year: 2013
Project Title:Site Investigation and necessary redesign of Lambu Bridge, Terathum and Dyadigad Bridge, Doti
Location: Achham and Okhaldhunga
Client: LILI/HELVETAS
Start Year: 2013
End Year: 2013
Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2012/13.
Location: Dailekh District
Client: LILI / HELVETUS
Start Year: 2013
End Year: 2016
Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Dailekh District
Location: Khotang District
Client: LILI / HELVETUS
Start Year: 2013
End Year: 2015
Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Khotang District
Location: Ramechhap District
Client: LILI / HELVETUS
Start Year: 2013
End Year: 2014
Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Ramechhap District
Location: Pyuthan
Client: DDC Pyuthan
Start Year: 2013
End Year: 2013
Project Title:Detailed Architectural Design and Structural Design,Drawing,Cost estimate and Bid document preparation of Sworgadawari Dharmasala Building in Puythan District
Location: Khotang, Bhojpur and Solukhumbhu Districts
Client: Asset Management, Contract Management and Quality Control Project, Department of Roads
Start Year: 2014
End Year: 2014
Project Title:Detailed Design Engineering Survey, Design and Preparation of Detailed Project Report(DPR) of Beltarbazar-Kamphughat-Pamakham Bhanjyang-Temke-Sapsudhap-Mayur Dand-Salpa Pokhari-Gudel to Solu Salleri Road
Location: Sindhupalchowk and Dolakha Districts
Client: GESU/DOR
Start Year: 2014
End Year: 2016
Project Title:Initial environmental examination (IEE) study for Lamosangu-Jiri Road (110 Km)
Location: Rolpa
Client: DOR
Start Year: 2014
End Year: 2014
Project Title:Feasibility Study Detailed Engineering Suevey Soil investigation Hydrological Study and Detailed Design of Deukhali Bagmara Bridge Rolpa
Location: Dolakha, Ramechhap, Sindhuli, Kavrepalanchowk, Sindhupalchowk, Kathmandu, Bhaktapur, Lalitpur, Nuwakot, Rasuwa, Dhading, Makawanpur, Chitwan
Client: TBSU
Start Year: 2014
End Year: 2014
Project Title:Providing Regional Technical Assistance for Trail Bridge Sub-Sector Program (Trail Bridge-Sector Wide Approach FrameWork II), Central Region, Bagmati Province
Location: Gorkha, Tanahun, Lamjung, Syangja, Kaski, Myagdi, Prabat, Baglung, Gulmi, Palpa, Argakhachi, Manang, Mustang, Nawalprasi
Client: TBSU
Start Year: 2014
End Year: 2014
Project Title:Providing Regional Technical Assistance for Trail Bridge Sub-Sector Program (Trail Bridge-Sector Wide Approach FrameWork II), Western Region (Gandaki Province)
Location: Surkhet District
Client: Bheri Babai Irrigation Project /DOI
Start Year: 2014
End Year: 2014
Project Title:Planning and Design of Typical Lift Irrigation System using Solar Power in Bheri Corridor Area
Location: Puythan
Client: DOI
Start Year: 2014
End Year: 2014
Project Title:Detailed Feasibility study of Jhimrukh Dabur Irrigation Project Bangesal VDC Puythan
Location: Lalitpur
Client: DDC Lalitpur
Start Year: 2014
End Year: 2014
Project Title:Feasibility study Detailed Survey Design cost Estimate and report preparation of Kamalpokhari overhead Tank Imodal VDC 8 Lalitpur
Location: Tanahun
Client: TDF
Start Year: 2014
End Year: 2015
Project Title:Preparation of Master Plan and Detailed Engineering Design of a Multipurpose Building Complex in Vyas Municipality (Project No. : - K3G-014-F)
Location: Arghakhachi and Gulmi
Client: SSDRP/DOR Sandhikharka, Arghakhachi
Start Year: 2015
End Year: 2015
Project Title:Detailed Engineering Survey, DCP Test, Design of Roads, Concise IEE Study and DPR Preparation of Patauti – Kharjyang – Tamghas Road (35.5 km) in Arghakhachi and Gulmi District.
Location: Udayapur
Client: DDC Udayapur
Start Year: 2015
End Year: 2015
Project Title:Preparation of Detailed Project Report, DPR ( i) Survey and Investigation and (ii) Detailed Design, Drawing and Cost Estimate of Upgrading Works of 1. Beteni- Majhkharka Road 14A003R (Ch. 6+000 to 16+000), 2. Ranibas – Rauta- Salle-Kurletar Road 14A005R (Ch. 0+000to 12+000), 3. Katari – Bahunitar – Barre Road 14A006R (ch. 0+000 to 10+000) and 4. Nepaltar – Udayapur – Kurkuntar Road 14A013R (ch. 0+000 to 8+500) in Udayapur District Under SNRTP Programe (Tatal Road Length 40.50 km)