B. Detailed Engineering Survey, Design and Detailed Project Report Preparation of Road Projects

  • Detailed Survey, Engineering Design and Cost Estimate of Sapsu Khola Dandakharka Lift Irrigation Project

  • Location Client/Finance Period Value of service Remark
    Khotang Water Resources and Irrigation Development Division Khotang November 2021 - March 2022 0.415 SITARA
  • Detailed Feasibility Study of Ground Water Irrigation Project at Different Rural Municipality/Municipality in Sunsari and Morang Districts

  • Location Client/Finance Period Value of service Remark
    Morang and Sunsari Department of Water Resources and Irrigation, Prosperous Terai Madhesh Irrigation Special Program June 2021 - January 2022 NRs 1.695 Million SITARA
  • Detailed Feasibility Study of Ground Water Irrigation Project at Different Rural Municipality/Municipality in Kailali and Kanchanpur Districts.

  • Location Client/Finance Period Value of service Remark
    Kailali and Kanchanpur Department of Water Resources and Irrigation, Prosperous Terai Madhesh Irrigation Special Program June 2021 - February 2022 NRs 1.553 Million SITARA
  • Prefeasibility Study of Tamor Chisyang Diversion Multipurpose Project

  • Location Client/Finance Period Value of service Remark
    Terhathum, Panchthar, Morang, Sunsari, Jhapa Department of Irrigation June 2020 - June 2021 NRs 5.23 Million SITARA- Shah-DSC
  • Detailed feasibility study of Micro Hydro Operated Lift Irrigation System 

  • Location Client/Finance Period Value of service Remark
    Bajura AEPC June 2019 - July 2019 NRs 1.78 Million SITARA
  • Alternative Study between surface canal and tunnel conveying system from Babai River to provide year round irrigation (YRI) in 15000 ha and study the impact of climate change in Crop Water Requirement (CWR) 

  • Location Client/Finance Period Value of service Remark
    Surkhet, Banke and Bardiya BBDMP March 2019 - June 2019 NRs 1.69 Million SITARA
  • Feasibility Study including Preparation of Detailed Project Report Preparation of Bheri Corridor Irrigation Development Project (con 01/BCIDP/BBDMP/073-74)

  • Location Client/Finance Period Value of service Remark
    Surkhet and Salyan BBDMP June 2017 - August 2018 NRs 5.7 Million ERMC-SILT-SITARA JV
  • Detailed Engineering Survey, Design and Cost Estimate for the Rehabilitation of Banganga Irrigation System (6350 ha)  (Package Number: BIMD/072-73/CS

  • Location Client/Finance Period Value of service Remark
    Kapilbastu Jawalakhel, Lalitpur June 2016 - May 2017 NRs 2.768 Million ERMC-SILT-SITARA JV
  • Detailed Planning and Engineering Design of Branch Canals and Associated Command Area Development Downstream of Ch. 35+000 Km of Sikta IP (14,400 ha)

  • Location Client/Finance Period Value of service Remark
    Banke DOI/SIP December 2015 - May 2017 NRs 19.77 Million CMS-FBC-SITARA JV
  • The study of the utilization of the water resources along the downstream of Budhi Gandaki Hydro-electric project

  • Location Client/Finance Period Value of service Remark
    Gorkha and Dhading BGHP June 2015 - June 2016 NRs 3.35 Million FBC JV SITARA
  • Detailed Feasibility study of Jhimrukh Dabur Irrigation Project Bangesal VDC Puythan 

  • Location Client/Finance Period Value of service Remark
    Puythan DOI June 2014 - October 2014 NRs 0.48 Million SITARA
  • Planning and Design of Typical Lift Irrigation System using Solar Power in Bheri Corridor Area

  • Location Client/Finance Period Value of service Remark
    Surkhet District Bheri Babai Irrigation Project /DOI March 2014 - August 2014 NRs 0.299 Million SITARA
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Dailekh District 

  • Location Client/Finance Period Value of service Remark
    Dailekh District LILI / HELVETUS July 2013 - July 2016 NRs 1.014 Million SITARA
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Khotang District 

  • Location Client/Finance Period Value of service Remark
    Khotang District LILI / HELVETUS July 2013 - July 2015 NRs 2.174 Million SITARA
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Ramechhap District

  • Location Client/Finance Period Value of service Remark
    Ramechhap District LILI / HELVETUS July 2013 - July 2014 NRs 1.014 Million SITARA
  • Detailed Feasibility Study of the Extension of the Eastern main Canal of Bagmati Irrigation Project.

  • Location Client/Finance Period Value of service Remark
    Sarlahi, Mahottari, Bara, Rautahat and Dahnusha DOI July 2012 - June 2013 NRs 1.47 Million FBC JV SITARA
  • Pre-Feasibility Study of Sunkoshi - Marin Diversion Project 

  • Location Client/Finance Period Value of service Remark
    Sarlahi, Mahottari, Bara, Rautahat, Dahnusha and Sindhuli DOI July 2012 - June 2013 NRs 3.658 Million FBC JV SITARA
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2011/12. 

  • Location Client/Finance Period Value of service Remark
    Dailekh, Okhaldhunga, Jajarkot District. LILI/HELVETAS February 2012 - February 2013 NRs 3.03 Million SITARA
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different District in F/Y 2010/11.

  • Location Client/Finance Period Value of service Remark
    Khotang,Dailekh,Jajarkot & Achham Distict LILI/HELVETAS December 2010 - November 2011 NRs 3.8 Million SITARA
  • Preparation of Asset Management Plan and Financial Management Plan of IWRMP Component B.

  • Location Client/Finance Period Value of service Remark
    Kailali DOI/IWRMP June 2010 - October 2010 NRs 1.2 Million SITARA
  • Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)

  • Location Client/Finance Period Value of service Remark
    Kalikot and Achham district LILI/HELVETAS April 2010 - July 2010 NRs 1.55 Million SITARA
  • Pre-feasibility Study of Madi-Dang Diversion Project 

  • Location Client/Finance Period Value of service Remark
    Surkhet DOI Surkhet April 2010 - May 2011 NRs 4.06 Million CEMECA JV SITARA