Location: Mugu District

Client: DDC Mugu

Start Year: 2007

End Year: 2008

Project Title: Detail Survey, Design, and Preparation of report of Drinking Water Supply Schemes for the Office of DDC Mugu (10 Schemes)

Location: Mustang District

Client: DDC Mustang

Start Year: 2007

End Year: 2007

Project Title: Detailed Design, Drawing, Cost Estimate of Dharmasala Building at Muktinath

Location: Sindhupalchowk

Client: Caritas

Start Year: 2007

End Year: 2018

Project Title: Detailed site assessment of different schools for reconstruction of schools in Sindhupalchowk districts. (9 schools)

Project Title: Preparation of Technical Documents ,BOQ and Cost Estimate of 12 Schools

Location: Ramechhap District

Client: UNDP/REDP/KIND Project

Start Year: 2008

End Year: 2008

Project Title: Detail survey, design , Cost estimate and Preparation of Tender document of Transmission and distribution of Haluwa Khola Mini Hydro Project (400KW), Five VDCS of Ramechhap.

Location: Ilam District

Client: NCDC

Start Year: 2008

End Year: 2010

Project Title: Feasibility Study of 8 micro Hydro Power Projects

Location: Dhankuta

Client: ADB/RRRSDP/DDC Dhankuta

Start Year: 2009

End Year: 2013

Project Title: Detailed Engineering Design, IEE, DPR Preparation and Construction Supervision of : (i) Hile-Utterpani-Chhintangn Road (23.9 Km), (ii) Trishule - Hattikharka - Jitpur Road (20.16 Km), (iii) Raja Rani - 6 No. Budhabare Road (26.08 Km) and (iv) 6 No. Budhabare - Phirkaule (3.40 Km)

Location: Ilam

Client: ADB/RRRSDP /DDC Ilam

Start Year: 2009

End Year: 2013

Project Title: Detailed Engineering Design, IEE, DPR and Construction Supervision of : (i) I.Na.Pa.-Dhudhang-Soyang-nayabazar Road (7.12 Km), (ii)Rajduwali-Chisapani-Dhanabari Road (23.3 Km) and (iii)Mangalbare -Ivang Road (19.9 Km)

Location: Morang & Jhapa

Client: BP/DOR

Start Year: 2009

End Year: 2010

Project Title: Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Moterable Bridges in Morang and Jhapa District. (Package No-3) (11 Number Bridges)

Location: Rukum District

Client: MOST/AEPC/ESAP

Start Year: 2009

End Year: 2010

Project Title:Detail survey , design and Preparation of Detailed Project Report (DPR) of Simrutu Khola Mini Hydro Project (200 kW) ,Rukum

Location: Sankhuwasava

Client: DOR

Start Year: 2010

End Year: 2011

Project Title:Detailed Survey, Engineering Design, Cost Estimattion and Report Preparation of Num-Kimathanka Sector (45.5 Km) Khadbari, Sankhuwa

Location: Kaski

Client: DDC Kaski

Start Year: 2010

End Year: 2011

Project Title:Updating of District Transport Master Plan (DTMP) & District Transport Master Plan (DTPP) of Kaski District

Location: Kalikot and Achham district

Client: LILI/HELVETAS

Start Year: 2010

End Year: 2010

Project Title:Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)

Location: Kailali

Client: DOI/IWRMP

Start Year: 2010

End Year: 2010

Project Title:Preparation of Asset Management Plan and Financial Management Plan of IWRMP Component B.

Location: Khotang,Dailekh,Jajarkot & Achham Distict

Client: LILI/HELVETAS

Start Year: 2010

End Year: 2011

Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2010/11.

Location: Surkhet

Client: DOI Surkhet

Start Year: 2010

End Year: 2011

Project Title:Pre-feasibility Study of Madi-Dang Diversion Project

Location: Lalitpur

Client: DoLIDAR/MoLD

Start Year: 2010

End Year: 2010

Project Title:Preparation of Implementation Guideline and Technical Manual for Implementation of Micro Hydro Schemes.

Location: Achham,Bajura, Doti,Dadeldhura, Gulmi,Arghakhachi, Syangja & Palpa Districts

Client: AEPC/MOEn

Start Year: 2011

End Year: 2011

Project Title:Mapping of Micro Hydropower (MMHP) and Preparation of District Electrification Master Plan (DEMP) in Achham,Bajura, Doti,Dadeldhura, Gulmi,Arghakhachi, Syangja & Palpa Districts.

Location: Kavre, Sindhupalchowk, Dolakha, lalitpur, Khotang,Dhankuta & Terathum Districts

Client: AEPC/MOEn

Start Year: 2011

End Year: 2011

Project Title:Mapping of Micro Hydropower (MMHP) and Preparation of District Electrification Master Plan (DEMP) in Kavre, Sindhupalchowk, Dolakha, lalitpur, Khotang,Dhankuta & Terathum Districts

Location: Bajura & Achham

Client: AEPC

Start Year: 2011

End Year: 2011

Project Title:Conduct the Capacity Building of Stakeholders on Mini/Micro Hydropower Development in the Special District (Bajura & Achham)

Location: Rautahat

Client: TDF

Start Year: 2011

End Year: 2015

Project Title:Construction Supervision of Gaur Bus Terminal Project (Project No-K3L-001-CS/K#SL-002-CS/K#G-001-C) Gaur,Rautahat District

Location: Saptari

Client: DOR / RIP

Start Year: 2012

End Year: 2014

Project Title:Construction Supervision of Upgrading Works of following roads (Package D) in Rajbiraj and Saptari District: Rajbiraj – Sankhada Road,Rajbiraj - Rupani Road,Rajbiraj – Bhardah Road (41.97 Km)

Location: Kailali,Doti and Achham Districts

Client: GESU/DOR

Start Year: 2012

End Year: 2016

Project Title:Environmental Impact Assessment (EIA) Study of Seti Lok Marga (125 Km)

Location: Chitwan

Client: DDC Pyuthan

Start Year: 2012

End Year: 2012

Project Title:Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Khaireni (Tulsipur) Khola and Pampha (Uttarakhanda) Khola RCC Bridge of Chitwan District

Location: Pyuthan

Client: DDC Pyuthan

Start Year: 2012

End Year: 2012

Project Title:Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Chaukaha Bridge over Jhimruk River in Pyuthan District.

Location: Lalitpur

Client: CAAN

Start Year: 2012

End Year: 2012

Project Title:Detailed Engineering Survey and Design of Access Road and Preparation of Master Plan of the Area to be Placed Radar System

Location: Sarlahi, Mahottari, Bara, Rautahat and Dahnusha

Client: DOI

Start Year: 2012

End Year: 2013

Project Title:Detailed Feasibility Study of the Extension of the Eastern main Canal of Bagmati Irrigation Project.

Location: Dailekh, Okhaldhunga, Jajarkot District.

Client: LILI/HELVETAS

Start Year: 2012

End Year: 2013

Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2011/12.

Location: Sarlahi, Mahottari, Bara, Rautahat, Dahnusha and Sindhuli

Client: DOI

Start Year: 2012

End Year: 2013

Project Title:Pre-Feasibility Study of Sunkoshi - Marin Diversion Project

Location: Kathmandu

Client: Dolidar

Start Year: 2012

End Year: 2012

Project Title:Preparation of Strategic Plan for the Development of Micro Hydro through Dolidar

Location: 53 Districts of Nepal

Client: AEPC

Start Year: 2012

End Year: 2012

Project Title:Compilation of Mapping of Micro Hydropower and District Electrification Master Plan (MMHP & DEMP) Report and Upgrading in GIS of 53 Districts of Nepal.

Location: Nepal

Client: AEPC

Start Year: 2012

End Year: 2012

Project Title:Study on Technical Standards for Grid Connection of Micro Hydro in Nepal.

Location: Palpa

Client: REDA

Start Year: 2012

End Year: 2012

Project Title:Detailed Feasibility Study of Micro hydropower Projects

Location: Mugu

Client: DDC Mugu

Start Year: 2012

End Year: 2012

Project Title:Detailed Engineering Survey, Design and Report Preparation of sukhadhik Khola MHP

Location: Syangja

Client: TDF

Start Year: 2012

End Year: 2012

Project Title:Construction Supervision of Shree Kajiman Hari-Tika Higher Secondary School Building in Putalibazar Municipality, Syangja (Project Doce No-K2G-059-CS)

Location: Sindhupalchowk, Dolakha

Client: PMEU/DOR

Start Year: 2013

End Year: 2014

Project Title:Consulting Services for Detailed Engineering survey DCP Test Design of roads, concise IEE Study and DPR Preparation of Lamu Sanghu Jiri Road Sindhupkhowk , Dolakha (117Km ) ( package no PMUE - 337\ 069\070- Dpr -1)

 

Location: Panchthar

Client: Mid Hill Highway Project, Eastern Sector/DOR

Start Year: 2013

End Year: 2014

Project Title:Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km

 

Location: Baglung

Client: Mid Hill West,(Puspalal) Highway Project/DOR

Start Year: 2013

End Year: 2014

Project Title:Detailed Design for Upgrading of Highway to Blacktop Standard(Review of Mid Hill Highway Project and provision of access points to its corridor, Detailed Engineering Survey and Design of Highway and Other Structures and Preparation of Detailed Project Report (DPR) of Hatiya-Burtibang Section of Mid Hill Highway in Baglung District.)

 

Location: Gorkha

Client: GESU/DOR

Start Year: 2013

End Year: 2014

Project Title:Initial environmental examination study for Chhepetar-Luitel-Thatipokhari-Lamjung road

Location: Terthum and Doti

Client: LRBP

Start Year: 2013

End Year: 2013

Project Title:Site Investigation and necessary redesign of Lambu Bridge, Terathum and Dyadigad Bridge, Doti

Location: Achham and Okhaldhunga

Client: LILI/HELVETAS

Start Year: 2013

End Year: 2013

Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2012/13.

 

Location: Dailekh District

Client: LILI / HELVETUS

Start Year: 2013

End Year: 2016

Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Dailekh District

 

Location: Khotang District

Client: LILI / HELVETUS

Start Year: 2013

End Year: 2015

Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Khotang District

 

Location: Ramechhap District

Client: LILI / HELVETUS

Start Year: 2013

End Year: 2014

Project Title:Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Ramechhap District

Location: Pyuthan

Client: DDC Pyuthan

Start Year: 2013

End Year: 2013

Project Title:Detailed Architectural Design and Structural Design,Drawing,Cost estimate and Bid document preparation of Sworgadawari Dharmasala Building in Puythan District

Location: Khotang, Bhojpur and Solukhumbhu Districts

Client: Asset Management, Contract Management and Quality Control Project, Department of Roads

Start Year: 2014

End Year: 2014

Project Title:Detailed Design Engineering Survey, Design and Preparation of Detailed Project Report(DPR) of Beltarbazar-Kamphughat-Pamakham Bhanjyang-Temke-Sapsudhap-Mayur Dand-Salpa Pokhari-Gudel to Solu Salleri Road

 

Location: Sindhupalchowk and Dolakha Districts

Client: GESU/DOR

Start Year: 2014

End Year: 2016

Project Title:Initial environmental examination (IEE) study for Lamosangu-Jiri Road (110 Km)

 

Location: Rolpa

Client: DOR

Start Year: 2014

End Year: 2014

Project Title:Feasibility Study Detailed Engineering Suevey Soil investigation Hydrological Study and Detailed Design of Deukhali Bagmara Bridge Rolpa

Location: Dolakha, Ramechhap, Sindhuli, Kavrepalanchowk, Sindhupalchowk, Kathmandu, Bhaktapur, Lalitpur, Nuwakot, Rasuwa, Dhading, Makawanpur, Chitwan

Client: TBSU

Start Year: 2014

End Year: 2014

Project Title:Providing Regional Technical Assistance for Trail Bridge Sub-Sector Program (Trail Bridge-Sector Wide Approach FrameWork II), Central Region, Bagmati Province

 

Location: Gorkha, Tanahun, Lamjung, Syangja, Kaski, Myagdi, Prabat, Baglung, Gulmi, Palpa, Argakhachi, Manang, Mustang, Nawalprasi

Client: TBSU

Start Year: 2014

End Year: 2014

Project Title:Providing Regional Technical Assistance for Trail Bridge Sub-Sector Program (Trail Bridge-Sector Wide Approach FrameWork II), Western Region (Gandaki Province)

Location: Surkhet District

Client: Bheri Babai Irrigation Project /DOI

Start Year: 2014

End Year: 2014

Project Title:Planning and Design of Typical Lift Irrigation System using Solar Power in Bheri Corridor Area

Location: Puythan

Client: DOI

Start Year: 2014

End Year: 2014

Project Title:Detailed Feasibility study of Jhimrukh Dabur Irrigation Project Bangesal VDC Puythan

Location: Lalitpur

Client: DDC Lalitpur

Start Year: 2014

End Year: 2014

Project Title:Feasibility study Detailed Survey Design cost Estimate and report preparation of Kamalpokhari overhead Tank Imodal VDC 8 Lalitpur

Location: Tanahun

Client: TDF

Start Year: 2014

End Year: 2015

Project Title:Preparation of Master Plan and Detailed Engineering Design of a Multipurpose Building Complex in Vyas Municipality (Project No. : - K3G-014-F)

Location: Arghakhachi and Gulmi

Client: SSDRP/DOR Sandhikharka, Arghakhachi

Start Year: 2015

End Year: 2015

Project Title:Detailed Engineering Survey, DCP Test, Design of Roads, Concise IEE Study and DPR Preparation of Patauti – Kharjyang – Tamghas Road (35.5 km) in Arghakhachi and Gulmi District.

Location: Udayapur

Client: DDC Udayapur

Start Year: 2015

End Year: 2015

Project Title:Preparation of Detailed Project Report, DPR ( i) Survey and Investigation and (ii) Detailed Design, Drawing and Cost Estimate of Upgrading Works of 1. Beteni- Majhkharka Road 14A003R (Ch. 6+000 to 16+000), 2. Ranibas – Rauta- Salle-Kurletar Road 14A005R (Ch. 0+000to 12+000), 3. Katari – Bahunitar – Barre Road 14A006R (ch. 0+000 to 10+000) and 4. Nepaltar – Udayapur – Kurkuntar Road 14A013R (ch. 0+000 to 8+500) in Udayapur District Under SNRTP Programe (Tatal Road Length 40.50 km)