B. Detailed Engineering Survey, Design and Detailed Project Report Preparation of Road Projects

Project Completion Certificate
  • Detailed Engineering Survey, Design and Cost Estimate for the Rehabilitation of Banganga Irrigation System (6350 ha) (Package Number: BIMD/072-73/CS-
  • Location Client/Finance Period Value of service Remark
    Kapilbastu Jawalakhel,Lalitpur June 2016 to May 2017 2.768 ERMC-SILT-SITARA JV
    Project Completion Certificate
  • Detailed Planning and Engineering Design of Branch Canals and Associated Command Area Development Downstream of Ch. 35+000 Km of Sikta IP (14,400 ha)
  • Location Client/Finance Period Value of service Remark
    Banke DOI/SIP December 2015 to May 2017 19.77 CMS-FBC-SITARA JV
    Project Completion Certificate
  • The study of the utilization of the water resources along the downstream of Budhi Gandaki Hydro electric project
  • Location Client/Finance Period Value of service Remark
    Gorkha and Dhading BGHP 2016 3.35 FBC JV SITARA
    Project Completion Certificate
  • Detailed Feasibility study of Jhimrukh Dabur Irrigation Project Bangesal VDC Puythan
  • Location Client/Finance Period Value of service Remark
    SPuythan DOI June 2014 to October 2014 0.48 SITARA
    Project Completion Certificate
  • Planning and Design of Typical Lift Irrigation System using Solar Power in Bheri Corridor Area
  • Location Client/Finance Period Value of service Remark
    Surkhet District Bheri Babai Irrigation Project /DOI March 2014 to August 2014 0.299 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Dailakh District
  • Location Client/Finance Period Value of service Remark
    Dailakh District LILI / HELVETUS July 2013 to July 2016 1.014 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Khotang District (FMIS) in Dailakh District
  • Location Client/Finance Period Value of service Remark
    Khotang District LILI / HELVETUS July 2013 to July 2015 2.174 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Ramechhap District
  • Location Client/Finance Period Value of service Remark
    Ramechhap District LILI / HELVETUS July 2013 to July 2014 1.014 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2012/13.
  • Location Client/Finance Period Value of service Remark
    Achham and Okhaldhunga LILI/HELVETAS February, 2013 to September, 2013 3.84 SITARA
    Project Completion Certificate
  • Detailed Feasibility Study of the Extension of the Eastern main Canal of Bagmati Irrigation Project.
  • Location Client/Finance Period Value of service Remark
    Sarlahi, Mahottari, Bara, Rautahat and Dahnusha DOI July, 2012 to June, 2013 1.47 FBC JV SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2011/12.
  • Location Client/Finance Period Value of service Remark
    Dailekh, Okhaldhunga, Jajarkot District. LILI/HELVETAS Feb 2012-Feb 2013 3.03 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of
     
    • Farmer Managed Irrigation Schemes (FMIS) in
    • different Distirct in F/Y 2010/11.
  • Location Client/Finance Period Value of service Remark
    Khotang,Dailekh,Jajarkot & Achham Distict LILI/HELVETAS December 2010-2011 3.80 SITARA
    Project Completion Certificate
  • Preparation of Asset Management Plan and Financial Management Plan of IWRMP Component B.
  • Location Client/Finance Period Value of service Remark
    Kailali DOI/IWRMP June-October 2010 1.2 SITARA
    Project Completion Certificate
  • Pre-feasibility Study of Madi-Dang Diversion Project
  • Location Client/Finance Period Value of service Remark
    Surkhet DOI Surkhet 2010-2011 4.06 CEMECA JV SITARA
    Project Completion Certificate
  • Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)
  • Location Client/Finance Period Value of service Remark
    Kapilbastu Jawalakhel,Lalitpur 2.768 ERMC-SILT-SITARA JV
    Project Completion Certificate
  • 1. Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in
     
    • Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)
  • Location Client/Finance Period Value of service Remark
    Kalikot and Achham district LILI/HELVETAS April 2010 July 2010 1.55 SITARA